Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Randy Jenco



Contact Information

11315 Sunrise Gold Circle Suite A
Rancho Cordova, CA 95742



Telephone

(916) 852-5530



Fax

(916) 852-5533



Viking Construction Company
is seeking qualified DBEss


Project Name

Highway 80 Improvements at Dan Wilson Creek Bridge



Bid/Contract #

04-3G6904



Awarding Agency

Caltrans



Project Location

Fairfield, Solano County, CA



Bid Date

12/13/2018 at 02:00



Project Details

LEAD COMPLIANCE PLAN, DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMPORARY PAVEMENT MARKING (PAINT), TEMPORARY TRAFFIC STRIPE (PAINT), CHANNELIZER (SURFACE MOUNTED), PORTABLE CHANGEABLE MESSAGE SIGN, TEMPORARY RAILING (TYPE K), TEMPORARY CRASH CUSHION MODULE, TEMPORARY TRAFFIC SCREEN, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY REINFORCED SILT FENCE, TEMPORARY CONSTRUCTION ENTRANCE, TEMPORARY CONSTRUCTION ROADWAY, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, WATER QUALITY SAMPLING AND ANALYSIS DAY, WATER QUALITY MONITORING REPORT, WATER QUALITY ANNUAL REPORT, TEMPORARY CREEK DIVERSION SYSTEMS, REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE), TREATED WOOD WASTE, TEMPORARY HIGH-VISIBILITY FENCE, TEMPORARY CONSTRUCTION MAT, CLEARING AND GRUBBING, ROADSIDE CLEARING, SOIL AMENDMENT, PACKET FERTILIZER, PLANT (GROUP H), PLANT (GROUP I), PLANT (GROUP M), PLANT ESTABLISHMENT WORK, WOOD MULCH, FOLIAGE PROTECTOR, RISER SPRINKLER ASSEMBLY, DRIP VALVE ASSEMBLY, CAM COUPLER ASSEMBLY, 3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), MOVE-IN/MOVE-OUT (EROSION CONTROL), DRY SEED (SQFT), ROLLED EROSION CONTROL PRODUCT (NETTING), HYDROMULCH, FIBER ROLLS, HYDROSEED, COMPOST, HOT MIX ASPHALT (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE F), REMOVE ASPHALT CONCRETE DIKE, STRUCTURAL CONCRETE, DRAINAGE INLET, BONDED JOINT SEAL (MR 1"), BAR REINFORCING STEEL (BRIDGE), REMOVE CONCRETE DECK SURFACE, BRIDGE REMOVAL (PORTION), 18" ALTERNATIVE PIPE CULVERT, 18" CORRUGATED STEEL PIPE (.064" THICK), REMOVE CULVERT, REMOVE INLET, MISCELLANEOUS IRON AND STEEL, REMOVE PAVEMENT MARKER, GUARD RAILING DELINEATOR, PAVEMENT MARKER (RETROREFLECTIVE), MIDWEST GUARDRAIL SYSTEM (WOOD POST), VEGETATION CONTROL (MINOR CONCRETE), TRANSITION RAILING (TYPE WB-31), ALTERNATIVE IN-LINE TERMINAL SYSTEM, CONCRETE BARRIER (TYPE 736 MODIFIED), CONCRETE BARRIER (TYPE 736B), REMOVE GUARDRAIL, THERMOPLASTIC TRAFFIC STRIPE, 8" THERMOPLASTIC TRAFFIC STRIPE, 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 17-7), 6" THERMOPLASTIC TRAFFIC STRIPE (BROKEN 18-12), REMOVE THERMOPLASTIC TRAFFIC STRIPE, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION



We are an equal opportunity employer. Plans and Specifications may be reviewed at our office located at 11315 Sunrise Gold Circle Suite A, Rancho Cordova, or may be obtained from the Owner. Each subcontractor may be required to submit faithful performance and payment bonds. Contact our office if you need more information or help obtaining bonds, lines of credit, insurance, necessary equipment, supplies and materials or technical assistance.




Copyright © 2018, DBE GoodFaith, Inc. All rights reserved.