BROOKLYN BRIDGE REHABILITATION OF APPROACH ARCHES, TOWERS, AND MISCELLANEOUS REHABILITATION BOROUGHS OF MANHATTAN AND BROOKLYN
BRC270D
NYCDOT
Manhattan & Brooklyn, New York & Kings County, NY
02/07/2019 at 11:00
1-29-19 - Up to Addenda # 3
The work to be performed under this Contract consists of the Rehabilitation of the Brooklyn Bridge Approach Arch Blocks, Main Towers, and miscellaneous repairs. The contract limits extend from Park Row in Manhattan to Tillary Street in Brooklyn. The Arch Block Rehabilitation in Manhattan includes removal of the existing brick infill walls with the construction of new concrete infill walls with bricks at the outside face, rehabilitation of floors, cleaning and repointing of interior brick, and installation of ventilation. Soils below existing foundations will be jet grouted in Arch Blocks A through D indicated in the Contract Plans. Arch Block Rehabilitation in Manhattan and Brooklyn include removal of hazardous materials, rehabilitation of interior brick walls and installation of electrical service. Granite infill walls in the Brooklyn Arch Blocks will be encased at the interior surface.
Tower work includes the reinforcement of granite blocks in gothic arches, rehabilitation of tower tops and tower lighting. Cleaning and repointing of granite is being performed on the exteriors of the Arch Blocks, Anchorages, and Towers.
Miscellaneous work includes reinforcement of the Washington Street Abutment and drainage improvements.
Disciplines of work but not limited to: Clearing; Grubbing; Landscape; Subcontractor; Trucking; Testing; Ready Mix Concrete; Jet Grouting; Disposal; Asphalt; Jacking; Masonry; Granite; Brick; Restoration Subcontractors; Structural Steel; Rebar; Spray-Applied, Waterproofing Membrane; MPT Items and Traffic Control; Surveying; Engineers Field Office; On-Site Tow Truck Service; Cleaning Drainage Structures; Shutters; Doors; Louvers; Instrumentation; Rodent Control; CPM Scheduling; Security to Check ID; Electrical Subcontractor; Ductwork; Painting Subcontractor;
Below drop box you will find Plans, Specifications, current Addenda's and copies of our Subcontract/Purchase Order ("Agreement") your firm will be required to execute if awarded the contract. You must base your bid upon the contractual terms and conditions as they are reflected in the Agreement, without amendment. The upstream contractual environment on the Project is demanding and the Joint Venture will not entertain revisions to the contractual boilerplate, which should instead be reflected in your bid price. Any Questions and/or comments to the boilerplates shall be directed to Colleen Connors at cconnors@schiavone.net.
https://dbox.dragados-usa.com/owncloud/index.php/s/ncrJj8KWSKiNQ4G
Password: Schiavone6591
All proposals must include Bid Item Numbers; Addenda's; Confirm NAICS Code; EBO Certification must occur prior to bid date
Please advise what work you are coded for along with description.
Thank you in advance for your cooperation
Questions or concerns may be addressed via email to cconnors@schiavone.net.
Schiavone is an Equal Opportunity Employer/Contractor.
Your participation is greatly encouraged and appreciated.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.