Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Karly Glenn



Project Estimator

Joe Ferndino



Contact Information

13170 Telfair Ave
Sylmar, CA 91342



Telephone

(818) 362-9200



Fax

(818) 362-9300



Security Paving Company, Inc
is seeking qualified DBEss


Project Name

03-4F6004 Nevada County In And Near Truckee At Various Locations From 1.3 Miles West Of Soda Springs Overcrossing To 0.3 Mile East Of Donner Lake Undercrossing



Bid/Contract #

03-4F6004



Awarding Agency

Caltrans



Project Location

Truckee, Nevada County, CA



Bid Date

02/26/2019 at 02:00



Project Details

: Lead Compliance Plan, Develop Water Supply, Construction Area Signs, Traffic Control System, Type Iii Barricade, Temporary Railing (Type K), Alternative Temporary Crash Cushion, Prepare Storm Water Pollution Prevention Plan, Rain Event Action Plan, Storm Water Sampling And Analysis Day, Temporary Hydraulic Mulch (Bonded Fiber Matrix), Temporary Cover, Temporary Check Dam, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Gravel Bag Berm, Temporary Silt Fence, Street Sweeping, Treated Wood Waste, Clearing And Grubbing (Ls), Roadway Excavation, Bonded Fiber Matrix (Sqft), Rolled Erosion Control Product (Netting), Fiber Rolls, Compost (Cy), Minor Hot Mix Asphalt, Place Hot Mix Asphalt (Miscellaneous Area), Remove Asphalt Concrete Dike, Remove Concrete Dike, Drill And Bond (Tie Bar), Structural Concrete, Barrier Slab, 24" Flume Downdrain, 24" Tapered Inlet, 24" Flume Anchor Assembly, Rock Slope Protection (Light, Method B) (Cy), Place Portland Cement Concrete Dike (Type C), Natina Stain (Metal), Wildlife Escape Ramp, Fence (Type Wm, Metal Post), Milepost Marker, Snow Pole Marker, Object Marker (Type L-1), Midwest Guardrail System (Steel Post), Wildlife Passage Way (Type M), Transition Railing, End Anchor Assembly (Type Sft), Alternative In-Line Terminal System, Concrete Barrier, Remove Guardrail, Remove 6" Methyl Methacrylate Traffic Stripe, 12" Rumble Strip (Concrete Pavement), 6" Methyl Methacrylate Paint Traffic Stripe, 6" Methyl Methacrylate Paint Traffic Stripe, Fiber Optic Conduit, Trucking, Materials testing



Plans and specifications are available at the CDOT website: http://www.dot.ca.gov/hq/esc/oe/weekly_ads/index.php . They can also be reviewed at our office located, 13170 Telfair Ave. Sylmar, CA 91342, by appointment only. Security Paving Company, Inc. is requesting pricing for all items of work on the project. Subcontractors and suppliers are required to submit price quotes to us within a reasonable time prior to the bid date, in order to fully evaluate quote
100% performance bonds may be required for the full subcontracted amount. Security Paving will pay up to 2.5% of the bond premium Subcontractors must possess a valid California Contractor's license, DIR Registration Number, current insurance. Subcontractor's will be required to sign a standard subcontract agreement. Security Paving is signatory to Laborers, Operating Engineers, Cement Masons, Carpenters, and Teamsters unions. This is a prevailing wage project. Please call if you will need assistance in obtaining bonding, lines of credit, insurance, equipment, materials, or delivery schedules. Please contact our office if you are interested in this project. Security Paving will work cooperatively with all qualified firms seeking to work on this project. All quotes must include DIR number.
Contact: Send email quotes to kglenn@securitypaving.com :
Send Fax quotes to 818-362-9300




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.