Zandra Massari
andrew.butler@countyofnapa.org
1195 Third St
Napa, CA 94559
(707) 253-4351
(707) 253-4627
Oakville to Oak Knoll Reach - Group B Sites 15,17,18,19,20
PW 19-16
Napa County
Napa, Napa County, CA
05/09/2019 at 3:30
The project is located on the East and West banks of the Napa River in a stretch located between Yountville Cross Road and Oakville Cross Road in Napa County. The work will consist of demolition, grading, excavation, and off haul of soil, construction of biotechnical stabilization structures, construction of habitat features, and deployment of erosion control measures. Class A license is required for this project. There is a mandatory walk. Engineer's estimate is $1,842,200 and estimate for Additive Alternate 1 is $411,300.
The plans and specifications are available at:
https://www.countyofnapa.org/2562/Oakville-to-Oak-Knoll-Reach---Group-B-PW
Bidders bonds is required with Proposals. Insurance and Labor, Material and Performance Bonds are required once project is awarded.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.