Crane Services
2019-2
Santa Barbara County Flood Control and Water Conservation District
Various, Santa Barbara County County, CA
05/15/2019 at 02:00
An Equal Opportunity Employer is requesting proposals from qualified and certified MBE/WBE to provide crane services:
Project Title: On-call Crane Services
Project Location: Locations throughout Santa Barbara County
Owner: Santa Barbara County Flood Control and Water Conservation District
Bid Date/Time: May 15, 2019 at 2:00pm
We are seeking bids from MBE/WBE for crane services.
The Santa Barbara County Flood Control and Water Conservation District is receiving cost proposals for Blanket Heavy Crane Services Agreements for Fiscal Years 2019/20 and 2020/21 (July 1, 2019 through June 30, 2021). The selected contractor(s) will provide heavy crane services for the hourly rates quoted in the proposal with a "not to exceed" amount of $1,000,000 or other amount as ratified by the District. All services will be provided at the direction of the Flood Control District. In addition to the hourly rate for the equipment, the contractor will be allowed compensation based on a fixed cost for mobilization which includes demobilization. The mobilization cost shall be quoted per piece of equipment per job. The mobilization cost shall include all costs for mobilization and demobilization and will be negotiated at the time of a job and will depend on site and rigging necessary.
Request for Proposal (RFP) can be downloaded from:
https://rfp.cosbpw.net/Cons/RFPReg.aspx
Santa Barbara County Flood Control and Water Conservation District
130 E. Victoria Street, STE 200
Santa Barbara, CA 93101
Phone: (805) 681-5636 Fax: (805) 568-3434
Email: RTOMAS@co.santa-barbara.ca.us
Contact: Rick Tomasini
The contractor agrees to provide heavy crane services in accordance with the following specifications:
1. HOURLY RATES
The contractor shall supply any necessary labor, operators, and supplies to operate the equipment at the site. The contractor shall be compensated only for the hours that work is actually performed. No compensation will be allowed for mechanical failure, maintenance, or other down time.
2. MOBILIZATION COSTS
Mobilization costs shall be negotiated separately at the time of a job. Include all costs involved in transporting the equipment to and from the site, all set up and break down costs, and all of the labor and supplies necessary to prepare the equipment for work.
3. EXCAVATION BUCKETS
Included in the quoted hourly rate, the contractor shall provide an excavation bucket (clam shell or dragline) of equal or less size as determined by the District. The required bucket shall conform as follows: