Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Stacy Dutra



Project Estimator

Brock Kernaghan



Contact Information

17400 Clear Creek Rd.
Redding, CA 96001



Telephone

(530) 246-4292



Fax

(530) 246-9940



J. F. Shea Construction, Inc.
is seeking qualified DBEss


Project Name

Replace Reinforced Concrete Bridges & Construct Retaining Wall



Bid/Contract #

02-4G41U4



Awarding Agency

State of California Department of Transportation - Caltrans



Project Location

Various Locations, Shasta and Siskiyou County, CA



Bid Date

08/07/2019 at 02:00



Project Details

J. F. Shea Construction, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for all items of work, including but not limited to:
1 LEAD COMPLIANCE PLAN
2 PROGRESS SCHEDULE (CRITICAL PATH METHOD)
3 TIME-RELATED OVERHEAD (WDAY)
4 CONSTRUCTION AREA SIGNS
5 TRAFFIC CONTROL SYSTEM
6 FLASHING ARROW SIGN
7 TYPE III BARRICADE
8 TEMPORARY TRAFFIC STRIPE (TAPE)
9 TEMPORARY PAVEMENT MARKING (TAPE)
10 CHANNELIZER (SURFACE MOUNTED)
11 PLASTIC TRAFFIC DRUMS
12 PORTABLE CHANGEABLE MESSAGE SIGN (LS)
13 TEMPORARY RAILING (TYPE K)
14 ALTERNATIVE TEMPORARY CRASH CUSHION
15 TEMPORARY TRAFFIC SCREEN
16 PORTABLE VEHICLE SPEED FEEDBACK SIGNS
17 TRAFFIC CONTROL SURVEILLANCE
18 JOB SITE MANAGEMENT
19 PREPARE STORM WATER POLLUTION PREVENTION PLAN
20 RAIN EVENT ACTION PLAN
21 STORM WATER SAMPLING AND ANALYSIS DAY
22 STORM WATER ANNUAL REPORT
23 MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL)
24 TEMPORARY HYDRAULIC MULCH
25 TEMPORARY COVER
26 TEMPORARY CHECK DAM
27 TEMPORARY DRAINAGE INLET PROTECTION
28 TEMPORARY FIBER ROLL
29 TEMPORARY CONSTRUCTION ENTRANCE
30 STREET SWEEPING
31 TEMPORARY CONCRETE WASHOUT
32 ASBESTOS COMPLIANCE PLAN
33 REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE)
34 TREATED WOOD WASTE
35 CONTRACTOR-SUPPLIED BIOLOGIST (LS)
36 BAT AND BIRD EXCLUSION DEVICE
37 INVASIVE SPECIES CONTROL
38 REMOVE CONCRETE (CY)
39 TEMPORARY HIGH-VISIBILITY FENCE
40 CLEARING AND GRUBBING (LS)
41 ROADWAY EXCAVATION
42 ROCK EXCAVATION
43 SHOULDER BACKING
44(F) STRUCTURE EXCAVATION (BRIDGE)
45(F) STRUCTURE EXCAVATION (RETAINING WALL)
46(F) STRUCTURE BACKFILL (BRIDGE)
47(F) STRUCTURE BACKFILL (RETAINING WALL)
48(F) PERVIOUS BACKFILL MATERIAL (RETAINING WALL)
49 IMPORTED BORROW (CY)
50 HYDROSEED
51 CLASS 2 AGGREGATE BASE (CY)
52 HOT MIX ASPHALT (TYPE A)
53 PLACE HOT MIX ASPHALT DIKE (TYPE A)
54 PLACE HOT MIX ASPHALT DIKE (TYPE C)
55 PLACE HOT MIX ASPHALT DIKE (TYPE D)
56 PLACE HOT MIX ASPHALT DIKE (TYPE F)
57 PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA)
58 TACK COAT
59 REMOVE ASPHALT CONCRETE DIKE
60 COLD PLANE ASPHALT CONCRETE PAVEMENT
61 RAIL ELEMENT WALL
62 24" CAST-IN-DRILLED-HOLE CONCRETE PILING
63(F) STRUCTURAL CONCRETE, BRIDGE FOOTING
64(F) STRUCTURAL CONCRETE, BRIDGE
65(F) STRUCTURAL CONCRETE, BRIDGE (POLYMER FIBER)
66(F) STRUCTURAL CONCRETE, RETAINING WALL
67(F) STRUCTURAL CONCRETE, APPROACH SLAB (TYPE N)
68(F) STRUCTURAL CONCRETE, DRAINAGE INLET
69(F) MINOR CONCRETE (MINOR STRUCTURE)
70 FURNISH PRECAST PRESTRESSED CONCRETE WIDE FLANGE GIRDER (80'-90')
71 FURNISH PRECAST PRESTRESSED CONCRETE WIDE FLANGE GIRDER (110'-120')
72 ERECT PRECAST PRESTRESSED CONCRETE GIRDER
73 JOINT SEAL (MR 1")
74(F) BAR REINFORCING STEEL (BRIDGE)
75(F) BAR REINFORCING STEEL (RETAINING WALL)
76(F) BAR REINFORCING STEEL (EPOXY COATED) (BRIDGE)
77(F) HEADED BAR REINFORCEMENT
78 PUBLIC SAFETY PLAN
79 PREPARE CONCRETE BRIDGE DECK SURFACE
80 FURNISH POLYESTER CONCRETE OVERLAY
81(F) PLACE POLYESTER CONCRETE OVERLAY
82 BRIDGE REMOVAL, LOCATION A
83 BRIDGE REMOVAL, LOCATION B
84 18" ALTERNATIVE PIPE CULVERT
85 24" ALTERNATIVE PIPE CULVERT
86 12" CORRUGATED STEEL PIPE (.079" THICK)
87 18" CORRUGATED STEEL PIPE (.109" THICK)
88 24" CORRUGATED STEEL PIPE (.109" THICK)
89 3" PLASTIC PIPE (EDGE DRAIN OUTLET)
90 18" CORRUGATED STEEL PIPE DOWNDRAIN (.109" THICK)
91 24" CORRUGATED STEEL PIPE DOWNDRAIN (.109" THICK)
92 18" ANCHOR ASSEMBLY
93 24" ANCHOR ASSEMBLY
94 36" CORRUGATED STEEL PIPE INLET (.109" THICK)
95 18" STEEL FLARED END SECTION
96 18" ALTERNATIVE FLARED END SECTION
97 24" ALTERNATIVE FLARED END SECTION
98 36" PRECAST CONCRETE PIPE INLET
99 REMOVE CULVERT (LF)
100 REMOVE DOWNDRAIN (EA)
101 REMOVE INLET
102 REMOVE EDGE DRAIN
103 ROCK SLOPE PROTECTION (20 LB, CLASS I, METHOD B) (CY)
104 ROCK SLOPE PROTECTION FABRIC (CLASS 8)
105 MINOR CONCRETE (TEXTURED PAVING)
106(F) MISCELLANEOUS IRON AND STEEL
107 PREPARE AND STAIN CONCRETE
108 ELEVATED DOUBLE TWISTED WIRE MESH DRAPERY SYSTEM
109 REMOVE CHAIN LINK FENCE
110 REMOVE PAVEMENT MARKER
111 DELINEATOR (CLASS 2)
112 PAVEMENT MARKER (RETROREFLECTIVE-RECESSED)
113 MARKER (CULVERT)
114 REMOVE ROADSIDE SIGN (WOOD POST)
115 REMOVE ROADSIDE SIGN (STEEL POST)
116 RELOCATE ROADSIDE SIGN
117 FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED)
118 FURNISH SINGLE SHEET ALUMINUM SIGN (0.080" - UNFRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI)
119 FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"- FRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI)
120 FURNISH SINGLE SHEET ALUMINUM SIGN (0.080" - FRAMED) FOR RETROREFLECTIVE SHEETING (TYPE XI)
121 RETROREFLECTIVE SHEETING (TYPE XI)
122 ROADSIDE SIGN - ONE POST
123 ROADSIDE SIGN - TWO POST
124 INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD)
125 RECONSTRUCT TURNABLE ROADSIDE SIGN
126 MIDWEST GUARDRAIL SYSTEM
127 MIDWEST GUARDRAIL SYSTEM (7' POST)
128 VEGETATION CONTROL (MINOR CONCRETE)
129(F) TUBULAR BICYCLE RAILING
130 TRANSITION RAILING (TYPE WB-31)
131 END CAP (TYPE A)
132 END ANCHOR ASSEMBLY (TYPE SFT)
133 INTERMEDIATE ANCHOR ASSEMBLY
134 ALTERNATIVE IN-LINE TERMINAL SYSTEM
135 CONCRETE BARRIER (TYPE 60M)
136 CONCRETE BARRIER (TYPE 60MA)
137 CONCRETE BARRIER (TYPE 60MC)
138 CONCRETE BARRIER TYPE 60MP MOD
139(F) CONCRETE BARRIER (TYPE 842 MODIFIED)
140 REMOVE GUARDRAIL
141 SALVAGE METAL BRIDGE RAILING
142 REMOVE CONCRETE BARRIER
143 THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY)
144 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7)
145 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 36-12)
146 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY)
147 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY)
148 REMOVE THERMOPLASTIC TRAFFIC STRIPE
149 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT)
150 MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION
151 2" CONDUIT (BRIDGE)
152 CONDUIT SYSTEM
153 TEMPORARY LIGHTING SYSTEM
154 MODIFYING EXISTING ELECTRICAL SYSTEM
155 MOBILIZATION



J. F. Shea Construction Inc. is a union signatory contractor. Subcontractors must possess a current contractor's license, insurance coverage and worker's compensation for the entire length of the contract. All subcontractors will be required to sign our standard Subcontract Agreement. 100% payment and performance bonds may be required. Please call if you need assistance in obtaining insurance, bonding, equipment, materials and/or supplies. Plans and specifications can be viewed at our office located at 17400 Clear Creek Road, Redding, Ca. 96001 or call for any additional needed project information. J. F. Shea Construction Inc. intends to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will work with any interested subcontractor to identify opportunities to break items into economically feasible packages. Women and Minority Employees are encouraged to apply.


J. F. SHEA CONSTRUCTION, INC.
P.O. Box 494519 - Redding, CA 96049
Phone: (530) 246-4292 Fax: (530) 246-9940
An Equal Opportunity Employer




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.