Heidi Faria
Jason Martin and Donat Galicz
1520 Fourth Street
Berkeley, CA 94710
(510) 526-3424 ext. 3446
(510) 526-0990
The Improvements of East 14th Street from 162nd Avenue to 172nd Avenue
Specification No. 2340
Alameda County Public Works
San Leandro, Alameda County, CA
08/20/2019 at 14:00
Trucking, Temporary and Permanent Erosion Control Construction Surveying,
Traffic Control, Construction Area Signs, Flashing Arrow Signs, Delineators,
Temporary Business Entry Signs, Temporary Railing, Portable Changeable
Message Sign, Project Funding Identification Signs, Disposal of Contaminated Soils,
Clearing & Grubbing, Tree Protective Fencing, Imported Borrow, Milling (Cold Plane
Asphalt Concrete Pavement), Adjust Utilities to Grade, Geosynthetic Pavement Interlayer (Pavement Fabric), Minor Concrete, Reinforced Concrete Bioretention Tie-Beam,
Reinforced Concrete Pipe, Concrete Backfill, Bioretention Areas, Storm Drain
Manhole, Sidewalk Curb Drain, Curb Drain Boxes, Bioretention Areas, Storm Drain
Cleanouts, Standard Concrete Monument, Monument Preservation, Thermoplastic
Striping & Marking, Painted Curb, Roadside Signs, Fencing, Sewer Main, Sanitary
Sewer Manhole, SWPPP, Sweeping, Traffic Signal & Lighting System, Decorative
Pedestrian Light & Foundation, Fiber Optic Cable, Solar Rectangular Rapid Flashing
Beacon System, Electrical, Planting & Irrigation, Site Furnishings, Pavers, Pedestrian
Barrier, Traffic Control Plans, Biologist, Bird Survey, and Construction Materials
An Equal Opportunity Employer
100% Performance & Payment Bonds may be required. Worker's Compensation
Waiver of Subrogation required. Please call OCJ for assistance with bonding,
insurance, necessary equipment, material and/or supplies. OCJ is willing
to breakout any portion of work to encourage MBE/WBE Participation. Plans &
Specs are available for viewing at our office.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.