Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Pyper Daniels



Project Estimator

Mark Benzinger



Contact Information

P.O. Box 1006
Eureka, CA 95502



Telephone

(707) 443-6371



Fax

(707) 443-0277



Mercer-Fraser Company
is seeking qualified DBEss


Project Name

Upgrade Water Distribution & Wastewater Systems



Bid/Contract #

03-4F5804



Awarding Agency

Caltrans



Project Location

Elkhorn, Sacramento County, CA



Bid Date

07/23/2019 at 14:00



Project Details

LEAD COMPLIANCE PLAN
CONSTRUCTION AREA SIGNS
TRAFFIC CONTROL SYSTEM
TYPE III BARRICADE
PLASTIC TRAFFIC DRUMS
PORTABLE CHANGEABLE MESSAGE SIGN (LS)
JOB SITE MANAGEMENT
PREPARE STORM WATER POLLUTION PREVENTION PLAN
RAIN EVENT ACTION PLAN
STORM WATER SAMPLING AND ANALYSIS DAY
STORM WATER ANNUAL REPORT
MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL)
TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX)
TEMPORARY COVER
TEMPORARY FIBER ROLL
TEMPORARY SILT FENCE
TEMPORARY CONCRETE WASHOUT
ROADWAY EXCAVATION
ROADSIDE CLEARING
CULTIVATION
SOIL AMENDMENT
SLOW-RELEASE FERTILIZER
PLANT (GROUP A)
PLANT (GROUP B)
PLANT (GROUP U)
SOD
MAINTAIN EXISTING PLANTED AREAS
PLANT ESTABLISHMENT WORK
WOOD MULCH
CHECK AND TEST EXISTING IRRIGATION FACILITIES
REMOVE IRRIGATION FACILITY
SALVAGE IRRIGATION FACILITY
CONTROL AND NEUTRAL CONDUCTORS (ARMOR-CLAD)
1" REMOTE CONTROL VALVE
1 1/2" REMOTE CONTROL VALVE
2" REMOTE CONTROL VALVE
1 1/2" WYE STRAINER ASSEMBLY
FLOW SENSOR
TREE WELL SPRINKLER ASSEMBLY
POP-UP SPRINKLER ASSEMBLY (GEAR DRIVEN)
RISER SPRINKLER ASSEMBLY
3/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE)
1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE)
1 1/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE)
1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE)
2" PLASTIC PIPE (CLASS 315) (SUPPLY LINE)
BALL VALVE
PVC PIPE CONDUIT (SLEEVE)
IMPORTED TOPSOIL (CY)
COMPOST (CY)
CLASS 2 AGGREGATE BASE (CY)
LOCATING EXISTING FACILITIES
DESTROY WELL (LS)
WELL DEVELOPMENT
TESTING WELL (LS)
DRILL PILOT HOLE
REAMING WATER WELL
CONDUCTOR CASING
BLANK WELL CASING
WELL SCREEN
WELL INVESTIGATION
WATER WELL EQUIPMENT
WELL DISINFECTION
WATER QUALITY TESTING
MOBILIZATION, DEMOBILIZATION, AND FINAL CLEANUP
CHAIN LINK FENCE (TYPE CL-8, SLATTED)
8' CHAIN LINK GATE (TYPE CL-8, SLATTED)
REMOVE CHAIN LINK FENCE
BUILDING WORK



Mercer Fraser Company will work with interested subcontractors to identify opportunities to break down items into economically feasible packages. Mercer-Fraser Company is a union signatory contractor. Subcontractors must possess a current contractor's license, worker's compensation and insurance coverage during the entire length of the prime contract. 100% Performance and Payment Bonds may be required. Conditions or exceptions in Subcontractor's quote are expressly rejected unless accepted in writing. All Subcontractors will be required to sign our standard Subcontract Agreement. Plans and specifications are available for viewing at our office or you may call Mercer-Fraser Company for further assistance. Please call if assistance is needed in obtaining bonding, insurance, equipment, materials and supplies. Mercer-Fraser Company intends to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will consider all bids that may be submitted.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.