Heidi Faria
Greg Souder
1520 Fourth Street
Berkeley, CA 94710
(510) 526-3424 ext. 3446
(510) 526-0990
Place lean concrete base, HMA & HMA-0 and electronic toll system - Hwy 880 Fremont
Caltrans #04-2J8104
Caltrans
Fremont, Alameda County, CA
12/03/2019 at 14:00
Trucking, Temporary and Permanent Erosion Control Measures, Lead Compliance Plan, Progress Schedule, Construction Area Signs, Traffic Control System, Portable Changeable Message Sign, SWPPP, Rain Event Action Plan, Storm Water Sampling & Analysis, Sweeping, Treated Wood Waste, Temporary High Visibility Fence, Clearing & Grubbing, Roadway Excavation (Type Z-2 Aerially Deposited Lead), Hydroseed, Compost, Wood Mulch, Lean Concrete Base, AC Dike, Tack Coat, Adjust Inlet, Roadside Signs, Midwest Guardrail System, Vegetation Control (Minor Concrete), Alternative In-Line System, Pavement Marking, Electronic Tolling System, Electrical, and Construction Materials
O. C. Jones & Sons, Inc.
1520 Fourth St., Berkeley, CA 94710
510/526-3424 FAX: 510/526-0990
Greg Souder (510-809-3430 gsouder@ocjones.com) is the estimator on this project and he is available to provide assistance or answer questions regarding the project scope of work including bid requirements, break out of bid items, plan or spec interpretation, bonding or insurance requirements, and other bid assistance. Plans and specs are available to review at our Berkeley office, or can be sent out via Building Connected. Plans are also available under the Advertised Projects tab at the Caltrans website at: http://ppmoe.dot.ca.gov/des/oe/contract-awards-services.html. PDF format quotes should be emailed to the estimator or faxed to 510-526-0990 prior to noon on the date of the bid. Quotes from DBE Subcontractors, Suppliers and Truckers are highly encouraged. OCJ is willing to breakout any portion of work to encourage DBE participation. Subcontractors must possess a current DIR, Contractors License, and insurance and workers compensation coverage including waiver of subrogation. OCJ may require Performance and Payment bonds on subcontracts. OCJ will pay the bond premium up to 2% of the contract value. All subcontractors are required to execute OC Jones' standard subcontract agreement, comply with all insurance requirements, and name OCJ as additional insured. Copies of our agreement and insurance requirements are available upon request. OCJ is a Union contractor, and we are signatory to the Operating Engineers, Laborers, Teamsters, and Carpenters. OCJ is an Equal Opportunity Employer.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.