Suzie Ransom
Brad Sanders
195 Concourse Blvd. A
Santa Rosa, CA 95402
(707) 527-9968
(707) 527-0244
West Napa Pump Station
CIP 17711
Napa Sanitation District
Napa, Napa County, CA
02/19/2020 at 02:00
K.G. Walters Construction is seeking qualified certified DBE subcontractors and suppliers for the Napa Sanitation District West Napa Pump Station . Project is located in Napa, CA. Quotes requested include but aren't limited to the following scopes of work: surveying, demolition, shoring, dewatering, traffic control, earthwork, ac paving, fence, rebar, waterproofing, gutters and downspouts, insulation, concrete liner, solar system, painting, HVAC, electrical, and instrumentation, rock, erosion control, ready mix concrete, precast concrete, misc metals, plastic tanks, building materials pumps, piping, valves, specialties, plant equipment. Standard payment terms are 95% progress payments, 5% retention unless other terms are provided for in prime contract and bonds are provided at no cost to contractor. Subcontractors, suppliers and vendors shall apply the same affirmative steps for DBE participation as required in the specifications to be responsive.
An Equal Opportunity Employer Require 100% payment and performance bonds. Premium up to 1.5% paid by contractor.
Plans and specifications available at https://www.napasanplanroom.com/
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.