Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Michelle LaVanWay



Project Estimator

Kevin Ellis



Contact Information

32194 Outer Highway 10 South
Redlands, CA 92373



Telephone

(909) 797-7444



Fax

(909) 797-7755



Downing Construction, Inc.
is seeking qualified DBEs, MBEs, WBEs, SBEs, SBRA; LSAF; HUBs


Project Name

South Archibald Plume Raw Water Pipeline Project Phase III



Bid/Contract #

Spec No CDASA-19-13



Awarding Agency

Chino Basin Desalter Authority



Project Location

Ontario, San Bernardino County, CA



Bid Date

02/12/2020 at 02:00



Project Details

CBDA's South Archibald Plum Raw Water Pipeline, Phase III project is funded by the State Water Resources Control Board & United State Bureau of Reclamation. DCI is seeking quotes from subs and suppliers that are certified and qualified DBEs (DBE/MBE/WBE/SBE/SBRA/LSAF/HUB) to provide, but not limited to, the following: Jack & Bore; Cathodic Protection; Curb/Gutter/Sidewalk; Pre & Post Construction Video; Saw Cutting; Traffic Loops; Asphalt; Disinfect & Pressure Test Waterline; NPDES/SWPPP; Remove/Dispose of Contaminated Soil; Temp Construction Signs; PVC Pipe; and Traffic Control Plan.



Plans & Specs are available online at Chino Basin Desalter Authority's PlanetBids website: www.planetbids.com/portal/portal.cfm?CompanyID=41338. You may also contact our office for assistance with plans, specs, bonds and insurance. Please submit your quote, certifiation, DBE Forms 4500-3 & 4500-4 in order to be considered for this bid. Documents are due 2/11/2020 @ 3:00 PM PST.

Downing is an Equal Opportunity Employer.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.