Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Barbara Sasser



Project Estimator

Gabe Farncroft gfarncroft@bridgewaycci.com



Contact Information

3333 Vaca Valley Parkway, Suite 2000
Vacaville, CA 95688



Telephone

(707) 455-7033



Fax

(707) 455-7036



Bridgeway Civil Constructors, Inc.
is seeking qualified DBEss


Project Name

Canyon Road Bridge Replacement over San Leandro Creek



Bid/Contract #

14-101



Awarding Agency

Town of Moraga



Project Location

Moraga, Contra Costa County, CA



Bid Date

02/11/2020 at 14:00



Project Details

Bridgeway Civil Constructors, Inc. (Bridgeway) is an Equal Opportunity Employer and requests Subcontractor Quotes from all qualified subcontractors and suppliers including certified DBE/DVBE firms to perform commercially useful functions for the following items of work, including but not limited to:
CONSTRUCTION SURVEY AND STAKING, PROGRESS SCHEDULE (CRITICAL PATH METHOD), RESIDENT ENGINEER'S FIELD OFFICE, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMPORARY PAVEMENT MARKING (PAINT), TEMPORARY TRAFFIC STRIPE (PAINT), TEMPORARY PAVEMENT MARKER, TEMPORARY RAILING (TYPE K), PORTABLE CHANGEABLE MESSAGE SIGN, RELOCATE EXISTING TEMPORARY, SIGNAL AND SIGNS, TEMPORARY ALTERNATIVE CRASH CUSHION SYSTEM, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS (DAY), STORM WATER ANNUAL REPORT, STREET SWEEPING, MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL), TEMPORARY HYDRAULIC MULCH PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY REINFORCED SILT FENCE (TYPE 1), TEMPORARY CONSTRUCTION ENTRANCE, TEMPORARY CONCRETE WASHOUT, TOWN DIRECTED POTHOLING, ADJUST INLET (REMOVE GRATE AND CURB OPENING), BRIDGE REMOVAL (ORIGINAL BRIDGE), BRIDGE REMOVAL (TEMPORARY BRIDGE), REMOVE TREE, REMOVE TREE STUMP, CLEARING AND GRUBBING, STORM WATER TREATMENT EXCAVATION AND GRADING, ROADWAY EXCAVATION, STRUCTURE EXCAVATION (BRIDGE), STRUCTURE EXCAVATION (TYPE D), STRUCTURE BACKFILL (BRIDGE), DITCH EXCAVATION, IMPORTED BORROW, FIBER ROLLS, HYDROSEED, IMPORT MATERIAL BIORETENTION SOIL, CLASS 2 AGGREGATE BASE, HOT MIX ASPHALT (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE F), REMOVE ASPHALT CONCRETE PAVEMENT, COLD PLANE ASPHALT CONCRETE PAVEMENT, TEMPORARY SHORING, 30" CAST-IN-DRILLED HOLE CONCRETE PILING (BRIDGE), 24" CAST-IN-DRILLED HOLE CONCRETE PILING (WALL), 30" CAST-IN-DRILLED HOLE CONCRETE PILING (WALL), STEEL SOLDIER PILING (W12x53), STEEL SOLDIER PILING (W14x68), STEEL SOLDIER PILING (W12x136), STEEL SOLDIER PILING (W18x192), PRESTRESSING CAST-IN-PLACE CONCRETE, STRUCTURAL CONCRETE, BRIDGE FOOTING, STRUCTURAL CONCRETE, BRIDGE, STRUCTURAL CONCRETE, APPROACH SLAB (TYPE EQ), JOINT SEAL (TYPE B), BAR REINFORCING STEEL (BRIDGE), PRECAST CONCRETE LAGGING, REMOVE RETAINING WALL, SIDEWALK CROSS DRAIN, CONCRETE BACKFILL, 12" REINFORCED CONCRETE PIPE, 15" REINFORCED CONCRETE PIPE, 18" REINFORCED CONCRETE PIPE, 10' SLOTTED DRAIN, 6" PERFORATED PLASTIC PIPE UNDERDRAIN, 6" NON-PERFORATED PLASTIC PIPE UNDERDRAIN, CLASS 2 PERMEABLE AGGREGATE (BIORETENTION BASIN), DRAINAGE MANHOLE, INLET TYPE G, INLET TYPE J, INLET TYPE OCP (CALTRANS), "15" ALTERNATIVE FLARED, END SECTION", REMOVE CULVERT, REMOVE INLET, RELOCATE EXISTING WATERLINE, CONNECT TO EXISTING INLET, ROCK SLOPE PROTECTION (LIGHT, METHOD B), ROCK SLOPE PROTECTION FABRIC (CLASS 8), EROSION CONTROL FABRIC, DETECTABLE WARNING, MINOR CONCRETE (MINOR STRUCTURE), CONCRETE CURB & GUTTER, CONCRETE SIDEWALK, CONCRETE CURB RAMP, REMOVE CONCRETE SIDEWALK, REMOVE CONCRETE CURB & GUTTER, MISCELLANEOUS IRON AND STEEL (BIORETENTION), SOLID STEEL PLATE INLET COVER, REMOVE FENCE (BARBED WIRE), RELOCATE CHAIN LINK FENCE, REMOVE PAVEMENT MARKER, PAVEMENT MARKER (RETROREFLECTIVE), OBJECT MARKER, RELOCATE ROADWAY SIGN, ROADSIDE SIGN - ONE POST, REMOVE ROADSIDE SIGN, MIDWEST GUARDRAIL SYSTEM, TUBULAR BICYCLE RAILING, CABLE RAILING, TRANSITION RAILING (TYPE WB-31), END ANCHOR ASSEMBLY (TYPE SFT), ALTERNATIVE IN-LINE TERMINAL SYSTEM, CONCRETE BARRIER (TYPE 80 MODIFIED), CONCRETE BARRIER (TYPE 80 SW), THERMOPLASTIC TRAFFIC STRIPE



All items of work are made available including items of work normally performed by Bridgeway. Items included in quotations will be broken down into comparable packages as necessary to assist in identifying opportunities for DBE and DVBE Subcontractors.

Requirements: Bridgeway is signatory to the Carpenters, Cement Masons, Laborers and Operating Engineers unions. Subcontractors must be prepared to furnish payment and performance bonds for the full amount of subcontract price. Bonding assistance is available. Subcontractors must possess a current contractor's license, insurance and worker's compensation coverage meeting Bridgeway's requirements and will be required to sign the standard Bridgeway Subcontract Agreement. Please call the main office for a copy of the insurance requirements and agreement. Please include your Contractors License Number, DIR Number and your DBE Firm ID Number on the quote. Plans and specifications are available for viewing at our office. Please call if you need any help or assistance bidding this project including but not limited to; obtaining bonding, insurance, equipment, materials and/or supplies.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.