A.P. Giannini Middle School Modernization



Bid/Contract #

#11897



Awarding Agency

San Francisco Unified School District



Project Location

San Francisco, San Francisco County, CA



Bid Date

02/11/2020 at 02:00



Project Details

SCOPE: General Modernization of bldg. systems, seismic improvements incl. shear walls & FRP straps, new ext. windows (E) ext. finish repair, reroofing of the entire campus, int. construction & finishes & improvements at (E) bathrooms throughout, a new front entry stair & ramp. Complete remodeling of the kitchen area & relo of admin. offices. Site work improvements, ramp modifications, re-routing of (E) utilities, planters, temp. electrical service, hazmat abatement & install & removal of interim housing units.
PLA & Prevailing Wage Required / 5% Retention / See GCs 00 72 00 Article 11 for Insurance Requirements / RFI Deadline is 2/4/20 by 5PM/ MEP/FS Subs MUST be Prequalified to Bid / Site Visits 1/21 & 1/28 @ 1PM - Not Mand. for Subs / See Special Conditions 00 73 00 for Phasing, Milestones, Duration, NTP 3/11/20 & Liquidated Damages

Subcontractors must be registered with the DIR to bid on this project https://www.dir.ca.gov/dlse/dlsePublicWorks.html
It is now State of CA law to provide CSLB license #'s & DIR #'s on sub lists - make sure to have them on your bid scope!
Alten Construction may implement a CCIP (Contractor Controlled Insurance Program) on this or any Project

TRADES NEEDED (but not limited to): HazMat Abatement; Demo; Earthwork; Erosion Control; Site Utilities; Paving; Unit Pavers; CL Fences & Gates; Concrete Restore & Clean; Rebar; CIP Concrete; Structural Steel, Metal Fab, Railings; Carpentry; Cabinetry; Waterproofing; Insulation; Weather Barriers; Fiber Cement Siding; TPO Roofing; Sheet Metal Flashing & Trim; Roof Access.'s; Auditorium Smoke Louvers; Firestopping; Joint Sealants; Doors, Frames & Hdwr.; Entrances & Storefronts; Windows; Glazing & Mirrors; Louvers & Vents; Vapor Emission Ctrl.; Gypsum Board & Steel Framing; Ceramic Tile; Cement. Wood Fiber & Acoustical Ceilings; Wood, Resilient Athletic, Linoleum & Epoxy resinous Flooring; Terrazzo Stair Striping; Painting, Staining & Finishing; Misc. Specialties; Visual Display Units; Signs; Toilet Access. & Compart's; Folding Glass-Panel Partitions; Fire Ext.'s & Cabinets; Assist. Listening Syst.; Metal Lockers; Foodservice; Library Stack Syst.; Projector Screens & Mounts; Stage Work; Gym & Play Yard Equip.; Window Coverings; Casework & Countertops; Entrance Floor Mats & Frames; Fixed Audience Seating; Telescoping Stands; Fire Sprinklers; Plumbing; HVAC; Integrated Automation; Electrical; Communications; Electronic Safety & Security.



Plans & Specifications are available for review and take-off in our office. Email bids@altenconstruction.com to request download access from Procore. In order for bids to be considered, they must be received at our office by mail, phone or fax one (1) hour prior to bid closing time. PREVAILING WAGE RATES, INSURANCE FORM CG2010 11/85 (EQUIVALENT IS CG2010 0704 & CG203 COMBINED) & WEEKLY CERTIFIED PAYROLL REPORTS ARE REQUIRED. 100% PERFORMANCE & PAYMENT BONDS MAY BE REQUIRED. ALTEN CONSTRUCTION, INC. WILL PAY UP TO 1.5% OF BOND PREMIUM. WE ARE AN EQUAL OPPORTUNITY EMPLOYER. WE ARE SIGNATORY TO THE CARPENTER'S & LABORER'S UNIONS