Suzie Ransom
Brad Sanders
195 Concourse Blvd. A
Santa Rosa, CA 95402
(707) 527-9968
(707) 527-0244
Reno Stead Water Reclamation Facility 4 MGD Expansion
I200023-2732
CIty of Reno
Reno, Washoe County, NV
04/21/2020 at 14:00
K.G. Walters Construction is seeking qualified certified DBE subcontractors and suppliers for the City of Reno, NV Reno Stead Water Reclamation Facility 4 MGD Expansion. Quotes requested include but aren't limited to the following scopes of work: surveying, demolition, dewatering, rock and sand, SWPPP, hydroseeding, fencing, AC paving precast concrete, concrete, masonry, metal fabrications, waterproofing, building insulation, metal roofing, roof accessories, doors and frames, overhead doors, aluminum windows, painting and finishing, ID devices, prestressed concrete tank, metal buildings , canopies, hoist and crane, general process and utility pipe, valves, fittings, steel pipe, mechanical insulation,electrical and instrumentation, FRP fabrications, building materials, pumps, specialties and plant equipment. Standard payment terms are 95% progress payments, 5% retention unless other terms are provided for in prime contract and bonds are provided at no cost to contractor. Subcontractors, suppliers and vendors shall apply the same affirmative steps for DBE participation as required in the specifications to be responsive.
An Equal Opportunity Employer Require 100% payment and performance bonds. Premium up to 1.5% paid by contractor.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.