NYCDEP Construction of Shaft 17B-1 and Shaft 18B-1 City Tunnel No. 3 Stage 2
C547A
NYCDEP
Queens & Brooklyn, New York County, NY
04/23/2020 at 11:30
M/WBE Goal: 20% Combined
Duration: 72 Months
Schiavone/JP Picone/Michels a JV, are encouraging MWBE Subcontractors and Vendors who are registered with the directory of New York State Certified MWBEs found at the following internet address: https://ny.newycontracts.com to participate in this project.
All proposals must include: Bid Item Numbers; Addenda's; Copy of NYS MBE/WBE Certificate*
*All NYS MBE/WBE certificates must be current at bid time and remain current for the duration of the project.
Required Forms for all NYS MBE/WBE Subcontractors & Suppliers:
- EPA Form 6100-2 Subcontractor Participation Form
- EPA Form 6100-3 Subcontractor Performance Form
SUBCONTRACTING & MATERIAL SUPPLY OPPORTUNITIES INCLUDE, but are not limited to, the following: Trucking/Hauling, Traffic Control Items and Maintenance, Clearing, Landscaping, Excavation/Grading, Aggregates, Pipe, Drainage Structures, Storm Drainage, Lab Testing, Vibration Monitoring, Ready-Mixed Concrete and Shotcrete, Misc. Concrete Flatwork, Precast Concrete, Seeding, Erosion Control, , Lighting/Electrical, Signs, Reinforcing Steel, Membrane Waterproofing, Water Barriers, Blasting Materials, Generators, Dewatering Pumps, Ventilation Equipment, Stainless Steel Piping, HVAC Ductwork, Louvers, Rock Dowels, Tunnel and Shaft Formwork, Drilled Shafts, Micropiles, MPT, Electrical Subcontractors, Shaft Covers, Office Trailers, Fuel Suppliers, Piling, Fans, Build 2 Buildings to hold Electrical Panels etc., Safety, Surveying, and CPM.
Plans, Specifications, Addendum, and Boiler Plate Templates of our Subcontract/Purchase Order ("Agreement") are available on SmartBidNet.com, your firm will be required to execute IF AWARDED the contract. You must base your bid upon the contractual terms and conditions as they are reflected in the Agreement, without amendment. The upstream contractual environment on the Project is demanding and we will not entertain revision to the contractual boilerplate, which should instead be reflected in your bid price. Any questions or concerns please email Colleen Connors-Casenta at cconnors@schiavone.net.
All proposals and scopes to be uploaded to smartbid and emailed three (3) days prior to bid to our Lead Estimator, Brian Jepsen (bjepsen@schiavone.net) and Colleen Connors-Casenta
(cconnors@schiavone.net)
Thank you in advance for your cooperation
Schiavone is an Equal Opportunity Employer/Contractor.