Dan Dean
Glenn Dorflinger
655 W. Clay Street
Stockton, CA 95206
(209) 948-0302
(209) 948-6652
El Dorado Street Resurfacing
STPL-5929(295)
County of San Joaquin
Stockton, San Joaquin County, CA
04/09/2020 at 1:30
Knife River Construction is requesting pricing from DBE subcontractors, suppliers and trucking for the following types of work/bid Items, including but not limited to: Traffic Control System, Portable CMS Signs, Prepare SWPPP, Water Pollution Control, Planing Roadway Surfacing, Reconstruct Traffic Signal System, Clearing and Grubbing, Roadway Excavation, Earthwork, Shoulder Backing, Fog Seal Coat, Crack Treatment, Hot Mix Asphalt, Storm Drain Inlet, and Striping & Markings
Requirements: Knife River Construction (KRC) is signatory to Operating Engineers, Laborers, and Cement Masons unions. 100% performance and payment bonds may be required for the full amount of subcontract price. Subcontractors must possess a current contractor's license, insurance and worker's compensation coverage meeting KRC's requirements and will be required to sign the standard KRC Subcontract Agreement. Subcontractors must be compliant with SB 854 DIR Public Works Registration. All quotes must be in compliance with project plans and specifications for this specific project. KRC intends to work cooperatively with all qualified firms seeking work on this project.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.