Thompson Builders Corporation
is seeking qualified DBEss


Project Name

Caltrans 02-4E46U4 Bridge Improvements in Lassen County



Bid/Contract #

02-4E46U4



Awarding Agency

Caltrans



Project Location

Lassen County, Lassen County County, CA



Bid Date

04/02/2020 at 02:00



Project Details

Caltrans 02-4E46U4 Bridge Improvements
Owner: Caltrans
Location: Lassen County, CA

DBE goal: 14%

Bid Date: 4/2/2020 @ 2:00 PM Estimate: $31 million

Seeking ALL subcontractors/suppliers/truckers, but especially DBE subcontractors/suppliers/truckers, TRADES NEEDED (but not limited to):

Move-In/Move-out (Temporary Erosion Control), Temporary Hydraulic Mulch (Bonded Fiber Matrix),Temporary Creek Diversion Systems, Treated Wood Waste, Clearing and Grubbing (LS), Move-IN/Move-Out (Erosion Control), Bonded Fiber Matrix (SQFT), Compost (CY), Incorporate Materials, Hot Mix Asphalt (Type A), Data Core, Place Hot Mix Asphalt Dike (Type D), Furnish Steel Piling (HP 14 X 117), Drive Steel Piling (HP 14 X 117), Prestressing(Transverse Tie Rods), Furnish Precast Prestressed Concrete Slab (Type SI) Modified, Furnish Precast Prestressed Concrete Slab (Type SIV) Modified, Erect Precast

Prestressed Concrete Deck Unit, Bar Reinforcing Steel (Bridge), Bar Reinforcing Steel (Epoxy Coated), Bar Reinforcing Steel (Box Culvert), Bar Reinforcing Steel (Epoxy Coated) (Bridge), Prepare Concrete Bridge Deck Surface, Furnish Polyester Concrete Overlay, Place Polyester Concrete Overlay, Bridge Removal, 36" Cured-In-Place Pipeliner, 48" Cured-In-Place Pipeliner, Concrete (Concrete Apron), Minor Concrete (Curb) (CY), Prepare and Stain Concrete, Fence (Type BW, 5-Strand, Metal Post), Chain Link Fence (Type CL-6, Extension Arm), 4' Chain Link Gate (Type CL-6, Extension Arm), Midwest Guardrail System (Steel Post), Vegetation Control (Minor Concrete), Cable Railing, Transition Railing (Type WB-31), End Cap (Type TC), End Anchor Assembly (Type SFT), Alternative In-Line Terminal System, California ST-70SM Bridge Rail, 6"Thermoplastic Traffic Stripe (Recessed, Broken 12-3), 6" Thermoplastic Traffic Stripe (Recessed, Broken 36-12), 6" Thermoplastic Traffic Stripe (Recessed), 8" Thermoplastic Traffic Stripe (Recessed), Thermoplastic Pavement Marking(Recessed), 12" Rumble Strip (Asphalt Concrete Pavement), Electrical Service, Modifying Existing Electrical Service.



We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation. TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specs may be viewed in our office at 250 Bel Marin Keys Blvd., Bldg. A, Novato Monday through Friday from 7:30 AM to 4:30 PM or can be e-mailed upon request.

*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.