Project Name

Alvarado Trunk Sewer Phase IV and TS Water Main Relocations



Bid/Contract #

K-20-1927-DBB-3



Awarding Agency

City of San Diego



Project Location

San Diego , San Diego County, CA



Bid Date

04/07/2020 at 02:00



Project Details

Construction of the Alvarado Trunk Sewer Phase IV consists of installing approximately 25,004 ft. of new sewer pipe, abandonment of existing trunk sewer and manholes, groundwater dewatering, and discharge, bypass pumping, laterals reconnections, traffic control, revegetation areas, signal loop replacement and curb ramp installation. Construction of Alvarado TS Water Main Relocations consists of the replacement of approximately 7,288 ft. of existing 6", 8", 12" and 16" AC water mains and all appurtenances in accordance with the specification and drawings.

Per the plans: Construction of Alvarado Trunk Sewer Phase IV consists of, installing approximately 25,004 new linear feet (LF) of sewer pipe as follows: 6810 of open cut 30-inch, 4748 LF of open cut 36-inch, 2870 LF of open cut 42-inch, 7562 LF of tunneling/trenchless construction, 8832 LF of abandonment of existing sewer 12" main and replacement of junction structure existing manhole no. 271 at the instersection of Twain Avenue and Fairmount Avenue.

The work also includes the abandonment of existing trunk sewer manholes, groundwater dewatering and discharge, bypass pumping, laterals reconnections, jack-and-bore work areas, (i.e. jacking/receiving pit areas), temporary access roads, staging areas, traffic control, revegetation areas, repaving, signal loop replacements , and curb ramp installation.

Construction of the Alvarado TS Water Main Relocations consists of the replacement of approximately 7,415.19 linear feet of existing 6", 8",12" and 16" AC water mains and all appurtenances in accordance with the specification and drawings.

Subcontracting and supplier opportunities are available but not limited to the following categories of work: quality control testing subcontractors; traffic control subcontractors; demolition subcontractors; contaminated soil remediation subcontractors; hazardous waste removal subcontractors; concrete suppliers; grouting subcontractors; concrete cutting subcontractors; geotechnical instrumentation & monitoring subcontractors; asphalt paving subcontractors; aggregate suppliers; curbs, gutters and sidewalk subcontractors; pavement striping subcontractors; fencing subcontractors; landscaping subcontractors; CCTV (for sewers) subcontractors; auger boring subcontractors; trucking (dump trucks) subcontractors.

Mandatory SLBE-ELBE Utilization Participation: 22.3%

SLBE 9.0%
ELBE 13.3%

Due to the mandatory SLBE-ELBE participation requirements, it is important for all SLBE-ELBE firms to respond to this invitation to bid by providing a quote or letting us know in writing via email (estimating@jwfowler.com) or fax (503-623-9117), if you are NOT going to bid. We appreciate your timely response.

James W. Fowler Co. is an equal opportunity employer and we are requesting qualified subcontractor and supplier bids from all interested firms, including disadvantaged, minority, women, and other business enterprises. Where economically feasible, we are willing to divide total contract requirements into smaller portions or quantities to permit maximum participati on of SLBE-ELBEs, DBEs, MBEs, WBEs, and OBEs. Please contact us to discuss opportunities available.

James W. Fowler Co. will assist SLBE-ELBE subcontractors in obtaining necessary equipment, supplies, or materials. We are also available to provide assistance in obtaining bonding, lines of credit and/or insurance to SLBE-ELBE subcontractors.Please complete all negotiations 24-hours prior to bid opening. We also encourage the utilization of apprentices for this project.

Bid documents can be obtained from the City of San Diego or from James W. Fowler Co. by clicking on the link below. The plans and specs are available at no cost on the James W. Fowler Co. website at www.jwfowler.com. For more information, please contact James W. Fowler Co. at (503) 623-5373. Quotes may be faxed to (503) 623-9117 or emailed to estimating@jwfowler.com.



Please follow the below link for plans, specifications, and addenda issued for this project.

http://www.jwfowler.com/bidopportunities/