Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Savanna Auay-Fuay



Project Estimator

Tom Auay-Fuay



Contact Information

1970 N. Redwood Rd.
Salt Lake City, UT 84116



Telephone

(480) 293-3288



Fax

(480) 293-3070



Sundt/PCL, A Joint Venture
is seeking qualified DBEss


Project Name

Salt Lake City Department of Public Utilities - New Water Reclamation Facility Project - Early Work Package 2 - Biosolids Storage Pad, and Temporary Heavy Equipment Storage Facility, and Surcharge



Bid/Contract #

524905372



Awarding Agency

Sundt/PCL, A Joint Venture



Project Location

Salt Lake City, Salt Lake County, UT



Bid Date

05/04/2020 at 14:00



Project Details

Sundt/PCL, a Joint Venture is accepting bids for the Early Work Package 2 - Biosolids Storage Pad, and Temporary Heavy Equipment Storage Facility, and Surcharge, defined in the Contract Documents and other associated parts of the work included as part Salt Lake City Department of Public Utilities New Water Reclamation Facility Project. The Project is generally described as new construction of a Water Reclamation Facility located at 1365 W 2300 N, Salt Lake City, UT 84116, as indicated in the Contract Documents.

Sundt/PCL, a Joint Venture, is seeking and encouraging qualified, disadvantaged business Enterprises (DBEs) for all areas as listed below.

It is anticipated this project will receive funding from the U.S. Environmental Protection Agency (EPA) Water Infrastructure Finance and Innovation Act (WIFIA) loan program. As such, an entity who wants to be considered as a DBE must meet the requirements of Title 40 Part 33 - Participation by Disadvantaged Business Enterprises in United States Environmental Protection Agency Programs and be certified by EPA as a qualified DBE. Qualified DBEs must complete Section 4.0 MBE/WBE/DBE/DVBE/HUB Participation on Attachment 2_Scope Bid Form.xlsx. Sundt/PCL will verify certification through the Office of Small Business Programs (OSBP) Small Business Vendor Profile System (SBVPS).

The participation goals for Minorities and Females are established as a percentage participation rate, expressed in percentage terms for the Sundt/PCL aggregate workforce in each trade on all construction work. The Goals for Females is a nationwide goal of 6.9%. The Goals for Minorities for the "economic area" of the Salt Lake City-Ogden, UT covered area and is 6.0%.

ALL entities are expected to comply with the federal regulations pursuant to WIFIA loan program requirements referenced in Exhibit P - WIFIA Requirements. Several of these federal regulations include, but are not limited to:
a. Davis-Bacon Wage Requirements
b. American Iron and Steel (AIS) Requirements
c. Disadvantaged Business Enterprise (DBE) Requirement
d. Federal Nondiscrimination, Civil Rights, and EEO Requirements
e. Federal Lobbying Restrictions

* Disadvantaged business enterprise (DBE) means an entity owned or controlled by a socially and economically disadvantaged individual as described by Public Law 102-389 (42 U.S.C. 4370d) or an entity owned and controlled by a socially and economically disadvantaged individual as described by Title X of the Clean Air Act Amendments of 1990 (42 U.S.C. 7601 note); a Small Business Enterprise (SBE); a Small Business in a Rural Area (SBRA); or a Labor Surplus Area Firm (LSAF), a Historically Underutilized Business (HUB) Zone Small Business Concern, or a concern under a successor program.


Debarment and Suspension, Executive Order 12549, 51 FR 6370, February 21, 1986

The Subcontractor and/or Supplier shall comply with Subpart C of 2 C.F.R. Part 180, as supplemented by Subpart C of 2 C.F.R. Part 1532 (relating to debarment), including the verification requirements set forth in 2 C.F.R. §§ 180.300 and 180.320, and shall include in its contracts with respect to the Project similar terms or requirements for compliance. All contract pursuers who anticipate working on this project must be registered with htttp://www.sam.gov prior to receiving a contract on this project. Sundt/PCL respectfully requests that you register prior to submitting a bid.

New Restrictions on Lobbying, 31 USC 1352

FEDERAL LOBBYING RESTRICTIONS. Recipients of federal financial assistance may not pay any person for influencing or attempting to influence any officer or employee of a federal agency, a member of Congress, an officer or employee of Congress, or an employee of a member of Congress with respect to the award, continuation, renewal, amendment, or modification of a federal grant, loan, or contract. These requirements are implemented for USEPA in 40 CFR Part 34, which also describes types of activities, such as legislative liaison activities and professional and technical services, which are not subject to this prohibition. Upon award of this contract, Contractor shall complete and submit to the City the certification and disclosure forms in Appendix A and Appendix B to 40 CFR Part 34. Contractor shall also require all subcontractors and suppliers of any tier awarded a subcontract over $100,000 to similarly complete and submit the certification and disclosure forms pursuant to the process set forth in 40 CFR 34.110.

The following are scopes associated with this Work Package:

1. Ancillary project controls and work as defined in the General Conditions and Division 01 specifications not explicitly listed below.
2. Clearing and grubbing, site preparation, asphalt and concrete demolition, and general construction area preparation.
3. Clearing and grubbing and site preparation of all liquid train areas outside the Biosolids Drying Beds that are to receive preload fill. This includes the area within the wetlands.
4. Demolition and removal of existing conflicting utilities and associated utility relocations.
5. Foundation and soil preparation.
6. Construction of a Biosolids Storage Pad.
7. Construction of a Temporary Heavy Equipment Storage Facility.
8. Startup and commissioning activities associated with the Biosolids Storage Pad and Temporary Heavy Equipment Storage Facility.
9. Construction of ancillary utilities supporting the Biosolids Storage Pad and Temporary Heavy Equipment Storage Facilities including, but not limited to power, drains, non-potable water, surveys, and documentation.
10. Installation of prefabricated vertical drains or wick drains.
11. Placement of liquid train preload and surcharge.
12. Slope reinforcement of preloading materials.
13. Monitoring of fill thickness during placement of preloading materials and surcharging.


Bids are due no later than 2:00 PM MST, Tuesday, May 5, 2020. Bidding documents can be obtained by contacting Sundt/PCL at tauayfuay@sundt.com. Please do not contact Owner or Engineer. All questions to be emailed to tauayfuay@sundt.com and are due no later than April 15, 2020. Procedures for submitting bids, claiming an error, withdrawal of bids and other pertinent information are contained in the Instructions to Bidders. Sundt/PCL and Owner reserves the right to reject any or all bids.



Please contact Tom Auay-Fuay at tauayfuay@sundt.com to request plans/specs, bonding
requirements, etc.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.