Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Tian Yu Dong



Project Estimator

Tian Yu Dong



Contact Information

3503 Breakwater Ct
Hayward, CA 94545



Telephone

(510) 780-9181



Fax

(510) 780-9167



MALCOLM DRILLING COMPANY INC.
is seeking qualified MBEs, WBEs, San Francisco LBEss


Project Name

SEWPCP Biosolids Digester Facilities



Bid/Contract #

WW-647R Scope II



Awarding Agency

San Francisco Public Utilities Commission



Project Location

San Francisco, San Francisco County, CA



Bid Date

05/22/2020 at 13:59



Project Details

Spoil Handling, SWPPP planning and implementation, Mass excavation and backfill, Pile chipping, Pile removal, Survey, Trucking, Security, Resteel, Asphalt paving, Street sweeping, Concrete pumping, Concrete supply, Testing, Traffic management, Concrete Washout, Stairtower erection and rental, Contaminated soils testing, On Site demolition, Pre trenching, Work platform construction, Base rock placement



Plans/Specs for this project are available by request through Tian Dong at tdong@malcolmdrilling.com. Please fill out attached NDA and send to Tian with your request for plans/specs or they can be viewed at Malcolm
Drilling's office located at 3503 Breakwater Court Hayward, CA 94545 between the hours of
8am - 5pm, Monday to Friday. If you need assistance with bonding, credit, insurance, or technical
assistance with the plans and specs, please call us at 510.780.9181. 100% Payment and Performance
bonds may be required. Additionally, please call us if you
need assistance in obtaining equipment, supplies, or materials for this project. We look forward to
working with you on this project, please email us your quote at tdong@malcolmdrilling.com. If you
have technical questions regarding this bid, please contact Tian Dong at 510.780.9181 or
tdong@malcolmdrilling.com.




Copyright © 2020, DBE GoodFaith, Inc. All rights reserved.