Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Barbara Sasser



Project Estimator

Gabe Farncroft gfarncroft@bridgewaycci.com



Contact Information

3333 Vaca Valley Parkway, Suite 2000
Vacaville, CA 95688



Telephone

(707) 455-7033



Fax

(707) 455-7036



Bridgeway Civil Constructors, Inc.
is seeking qualified DBEss


Project Name

Construction on State Highway in El Dorado County at Fresh Pond from West of Forest Road/Outer Limits Lane



Bid/Contract #

03-3H4504



Awarding Agency

State of California, Department of Transportation



Project Location

Fresh Pond, El Dorado County, CA



Bid Date

06/02/2020 at 02:00



Project Details

Bridgeway Civil Constructors, Inc. (Bridgeway) is an Equal Opportunity Employer and requests Subcontractor Quotes from all qualified subcontractors and suppliers including certified DBE/DVBE firms to perform commercially useful functions for the following items of work, including but not limited to:
PROGRESS SCHEDULE (CRITICAL PATH METHOD), TIME-RELATED OVERHEAD (LS), DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGN, TRAFFIC CONTROL SYSTEM, TEMPORARY PAVEMENT MARKING (PAINT), TEMPORARY TRAFFIC STRIPE (PAINT), CHANNELIZER (SURFACE MOUNTED), PLASTIC TRAFFIC DRUMS, PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMS, PORTABLE CHANGEABLE MESSAGE SIGN (LS), TEMPORARY RAILING (TYPE K), ALTERNATIVE TEMPORARY CRASH CUSHION, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY EROSION CONTROL BLANKET, TEMPORARY COVER, TEMPORARY CHECK DAM, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY GRAVEL BAG BERM, TEMPORARY REINFORCED SILT FENCE, TEMPORARY CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, CONTRACTOR-SUPPLIED BIOLOGIST (LS), CLEARING AND GRUBBING (LS), ROADWAY EXCAVATION, STRUCTURE EXCAVATION (SOLDIER PILE WALL), STRUCTURE BACKFILL (SOLDIER PILE WALL), CONCRETE BACKFILL (SOLDIER PILE WALL), LEAN CONCRETE BACKFILL, PLANT (GROUP I), WOOD MULCH, MOVE-IN/MOVE-OUT (EROSION CONTROL), ROLLED EROSION CONTROL PRODUCT (NETTING), HYDROMULCH, COMPOST SOCK, STRAW, HYDROSEED, COMPOST (CY), CLASS 2 AGGREGATE BASE (CY), HOT MIX ASPHALT (TYPE A), GEOSYNTHETIC PAVEMENT INTERLAYER (PAVING FABRIC), PLACE HOT MIX ASPHALT DIKE (TYPE E), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, GROUND ANCHOR (SUBHORIZONTAL), STEEL SOLDIER PILE (2-W 12 X 45), 36" DRILLED HOLE, STRUCTURAL CONCRETE, GROUND ANCHOR COVER BLOCK, STRUCTURAL CONCRETE, BARRIER SLAB, STRUCTURAL CONCRETE, DRAINAGE INLET, BAR REINFORCING STEEL (EPOXY COATED) (ANCHOR COVER BLOCK), TIMBER LAGGING, CLEAN AND PAINT STEEL SOLDIER PILING, REMOVE RETAINING WALL (LF), 18" REINFORCED CONCRETE PIPE (CLASS IV), 30" REINFORCED CONCRETE PIPE (CLASS IV), 12" PERFORATED PLASTIC PIPE UNDERDRAIN, 8" NON-PERFORATED PLASTIC PIPE, 30" CORRUGATED STEEL PIPE DOWNDRAIN (.138" THICK), 30" ANCHOR ASSEMBLY, REMOVE CULVERT (LF), REMOVE DOWNDRAIN (EA), REMOVE INLET, ROCK SLOPE PROTECTION (150 LB, CLASS III, METHOD B) (CY), ROCK SLOPE PROTECTION FABRIC (CLASS 8), MISCELLANEOUS IRON AND STEEL, MARKER (CULVERT), RELOCATE ROADSIDE SIGN, MIDWEST GUARDRAIL SYSTEM (STEEL POST), VEGETATION CONTROL (MINOR CONCRETE), TRANSITION RAILING (TYPE WB-31), CALIFORNIA ST-70 BRIDGE RAIL, REMOVE GUARDRAIL, REMOVE PAINTED TRAFFIC STRIPE, REMOVE PAINTED PAVEMENT MARKING, 12" RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT), 6" METHYL METHACRYLATE PAINT TRAFFIC STRIPE (RECESSED), 6" METHYL METHACRYLATE PAINT TRAFFIC STRIPE (RECESSED, BROKEN 36-12), MOBILIZATION



All items of work are made available including items of work normally performed by Bridgeway. Items included in quotations will be broken down into comparable packages as necessary to assist in identifying opportunities for DBE and DVBE Subcontractors.
Requirements: Bridgeway is signatory to the Carpenters, Cement Masons, Laborers and Operating Engineers unions. Subcontractors must be prepared to furnish payment and performance bonds for the full amount of subcontract price. Bonding assistance is available. Subcontractors must possess a current contractor's license, insurance and worker's compensation coverage meeting Bridgeway's requirements and will be required to sign the standard Bridgeway Subcontract Agreement. Please call the main office for a copy of the insurance requirements and agreement. Please include your Contractors License Number, DIR Number and your DBE Firm ID Number on the quote. Plans and specifications are available for viewing at our office. Please call if you need any help or assistance bidding this project including but not limited to; obtaining bonding, insurance, equipment, materials and/or supplies.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.