ERIN QUERIO
CARTER MASTERSON
3286 FITZGERALD RD
RANCHO CORDOVA, CA 95742
(916) 287-9099
(916) 435-5236
HONEY RUN COVERED BRIDGE PROJECT
N/A
Honey Run Covered Bridge Association
Chico, Butte County, CA
06/05/2020 at 02:00
CONSTRUCTION STAKING, LEAD COMPLIANCE PLAN, CONSTRUCTION SIGNAGE, SWPPP, EROSION CONTROL, CONSRETE WASHOUT, CLEAR AND GRUB, RAODWAY EXCAVATION, STRUCTURE EXCAVATION, STRUCTURE BACKFILL, DECORATIVE BOULDERS, AGG BASE, HOT MIX ASPHALT, TEMP SHORING, STRUCTURAL CONCRETE, RESTEEL, STRUCTURAL STEEL, 36' CIDH PILING, BRIDGE REMOVAL, 36" WELDED STEEL PIPE, ROCK SLOPE PROTECTION, ERECT TIMBER TRUSS, TRUCKING, MISC. MATERIAL SUPPLY
Plans for this project are attached to this listing or they can be viewed at Malcolm International's office located at 3286 Fitzgerald Rd Rancho Cordova, CA 95742 between the hours of 8am - 5pm, Monday to Friday. If you need assistance with bonding, credit, insurance, or technical assistance with the plans and specs, please call us at 916.287.9099. 100% Payment and Performance bonds may be required. Additionally, please call us if you need assistance in obtaining equipment, supplies, or materials for this project. We look forward to working with you on this project, please email us your quote at estimating@malcolmintl.com. If you have technical questions regarding this bid, please contact Carter Masterson at 360.980.2974 or cmasterson@malcolmintl.com.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.