Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Todd Anderson



Project Estimator

Todd Anderson



Contact Information

217 Bateman Dr.
Central Point, OR 97502



Telephone

(916) 922-1505



Fax

(916) 922-1511



F. D. Thomas, Inc.
is seeking qualified DVBEss


Project Name

Caltrans 07-314204 Sun Valley Overhead Project



Bid/Contract #

07-314204



Awarding Agency

Caltrans



Project Location

Los Angeles, Los Angeles County, CA



Bid Date

06/03/2020 at 02:00



Project Details

F. D. THOMAS, INC. IS SEEKING QUOTATIONS FROM ALL QUALIFIED DVBE SUBCONTRACTORS AND/OR MATERIAL SUPPLIERS. We are requesting bids for the following trades and/or material suppliers. FDT is willing to split bid items based on DVBEs scope of work and capabilities.
Lead Compliance Plan, Construction Area Signs, Traffic Control System, Channelizer (Surface Mounted), Temporary Railing (Type K), Temporary Crash Cushion Module, Job Site Management, Prepare Water Pollution Control Program, Temporary Concrete Washout, Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste), Work Area Monitoring (Bridge), Remove Concrete (CY), Structural Concrete, Bridge (RSC), Minor Concrete (Minor Structure), Plug Deck Drain, Bar Reinforcing Steel (Bridge), Bridge Removal (Portion), 8" Corrugated Steel Pipe (.079" Thick), Bridge Deck Drainage System, Remove Pavement Marker, Pavement Marker (Retroreflective), 6" Thermoplastic Traffic Stripe, 8" Thermoplastic Traffic Stripe, Thermoplastic Pavement Marking, 6" Two-Component Paint Traffic Stripe (Broken 36-12), 8" Two-Component Paint Traffic Stripe (Broken 36-12), Remove Painted Traffic Stripe, Remove Thermoplastic Traffic Stripe, Remove Thermoplastic Pavement Marking, Contrast Stripe Paint (2-Coat)



F. D. Thomas Inc. is a union signatory contractor. Subcontractors must possess a current contractor's license, insurance coverage and worker's compensation for the entire length of the contract. All subcontractors will be required to sign our standard Subcontract Agreement, 100% payment and performance bonds may be required. Please call if you need assistance in obtaining insurance, bonding, equipment, materials and/or supplies.
F. D. Thomas Inc. intends to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will work with any interested subcontractor to identify opportunities to break items into economically feasible packages.
Plans and specs are available in our office or on the Caltrans website at http://ppmoe.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.