Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Dennis Yum



Project Estimator

Dennis Yum



Contact Information

2098 S. Grand Ave. Suite A
Santa Ana, CA 92705



Telephone

(714) 641-4730



Fax

(714) 641-4704



ACCU Construction, Inc.
is seeking qualified DBEss


Project Name

Place HMA-A, minor concrete, modify landscape and electrical system



Bid/Contract #

Contract No. 11-411334



Awarding Agency

California Department of Transportation



Project Location

San Diego, San Diego County, CA



Bid Date

06/23/2020 at 14:00



Project Details

ACCU Construction, Inc. is bidding this project as a Prime General Contractor. We are actively seeking bids on all trades from qualified & certified DBE subcontractors, equipment, materials, and suppliers. Plans and specs are available for your review at our office located at 2098 S. Grand Ave. Suite A, Santa Ana, CA 92705 or you can send request or interest in this project and we will send you the specs/plans. All sub-bids should be either faxed to (714) 641-4704 or emailed to dennis@accuconstruction.com prior to 5:00 P.M. on June 22, 2020. We will provide required assistance in bonding, insurance, or lines of credit. Portions of work for the project include but are not limited to the following items of work. They have been broken down and can be broken down further into economically feasible elements to assist the participation of DBE contractors or vendors:

LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMPORARY PAVEMENT MARKING (PAINT), TEMPORARY TRAFFIC STRIPE (PAINT), PLASTIC TRAFFIC DRUMS, PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMS, TEMPORARY PAVEMENT MARKER, PORTABLE CHANGEABLE MESSAGE SIGN, ALTERNATIVE TEMPORARY CRASH CUSHION, TEMPORARY ALTERNATIVE BARRIER SYSTEM, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX), TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, MANAGE SOLID WASTE GENERATED BY THE PUBLIC, TREATED WOOD WASTE, REMOVE CONCRETE, CLEARING AND GRUBBING, ROADWAY EXCAVATION, ROADWAY EXCAVATION (TYPE Z-2) (AERIALLY DEPOSITED LEAD), ROADSIDE CLEARING, WEED GERMINATION, IRON SULFATE, PACKET FERTILIZER, SLOW-RELEASE FERTILIZER, PLANT (GROUP H), PLANT (GROUP K), PLANT (GROUP U), MAINTAIN EXISTING PLANTED AREAS, PLANT ESTABLISHMENT WORK, WOOD MULCH, CHECK AND TEST EXISTING IRRIGATION FACILITIES, REMOVE IRRIGATION FACILITY, SALVAGE IRRIGATION FACILITY, CONTROL AND NEUTRAL CONDUCTORS, 1" REMOTE CONTROL VALVE, 1 1/2" REMOTE CONTROL VALVE, 2" REMOTE CONTROL VALVE, 3" REMOTE CONTROL VALVE, 32 STATION IRRIGATION CONTROLLER AND ENCLOSURE '113G', 32 STATION IRRIGATION CONTROLLER AND ENCLOSURE, 24 STATION IRRIGATION CONTROLLER AND ENCLOSURE, 24 STATION IRRIGATION CONTROLLER AND ENCLOSURE, 48 STATION IRRIGATION CONTROLLER AND ENCLOSURE, ANTENNA MAST, YAGI ANTENNA '113E', CERTIFY EXISTING BACKFLOW PREVENTERS, BACKFLOW PREVENTER ENCLOSURE, FLOW SENSOR, TREE WELL SPRINKLER ASSEMBLY, RISER SPRINKLER ASSEMBLY (GEAR DRIVEN), POP-UP SPRINKLER ASSEMBLY (GEAR DRIVEN), POP-UP SPRINKLER ASSEMBLY, REPLACE VALVE BOX COVER, 2" GATE VALVE, 3" GATE VALVE, 1" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1 1/4" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 1 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 2 1/2" PLASTIC PIPE (SCHEDULE 40) (SUPPLY LINE), 3" PLASTIC PIPE (CLASS 315) (SUPPLY LINE), 10" CORRUGATED HIGH DENSITY POLYETHYLENE PIPE CONDUIT, 8" POLYVINYL CHLORIDE PIPE CONDUIT, CLASS 2 AGGREGATE BASE (CY), ASPHALT TREATED PERMEABLE BASE, ASPHALTIC EMULSION (FOG SEAL COAT), HOT MIX ASPHALT (TYPE A)","PLACE HOT MIX ASPHALT DIKE (TYPE D), PLACE HOT MIX ASPHALT DIKE (TYPE E), PLACE HOT MIX ASPHALT DIKE (TYPE D MODIFIED), PLACE HOT MIX ASPHALT DIKE (TYPE E MODIFIED), PLACE HOT MIX ASPHALT (MISCELLANEOUS AREA), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, STRUCTURAL CONCRETE, DRAINAGE INLET, 18" ALTERNATIVE PIPE CULVERT, 18" ALTERNATIVE SLOTTED PIPE, ROCK SLOPE PROTECTION FABRIC (CLASS 10), CELLULAR CONFINEMENT SYSTEMS, MINOR CONCRETE (CURB) (CY), MINOR CONCRETE (EXPOSED AGGREGATE CONCRETE), MINOR CONCRETE (STAMPED CONCRETE), REMOVE CONCRETE CURB, MISCELLANEOUS IRON AND STEEL, CHAIN LINK FENCE (TYPE CL-6), 10' CHAIN LINK GATE (TYPE CL-6)","REMOVE CHAIN LINK FENCE, REMOVE PAVEMENT MARKER, TEMPORARY DELINEATOR (CLASS 1), PAVEMENT MARKER (RETROREFLECTIVE), REMOVE ROADSIDE SIGN, RELOCATE ROADSIDE SIGN, FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED), ROADSIDE SIGN - ONE POST, SIGN POST SUPPORT SYSTEM, VEGETATION CONTROL MAT (RUBBER OR FIBER), THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 17-7), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY),8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), REMOVE PAINTED TRAFFIC STRIPE, REMOVE THERMOPLASTIC PAVEMENT MARKING, SUBSURFACE LOCATOR, ELECTRIC SERVICE FOR IRRIGATION, MODIFYING LIGHTING SYSTEMS, MODIFYING RAMP METERING SYSTEMS, MODIFYING TRAFFIC MONITORING STATIONS, MODIFYING WRONG-WAY DETECTION SYSTEMS.



Quotes per project bid items must be submitted before the due bid date and time to allow proper evaluation. Quotes are required to be in accordance with project plans, specs, and good for the entire contract duration. This project is a prevailing wage public job. The quote must consider all terms related to prevailing wages terms. Subcontractors must possess and maintain a current contractor license, insurance, and worker compensation coverage during the project. 100% payment bond and performance bond for the full amount of the subcontract price may be required. Firms that submit their quote explicitly acknowledge and agree to all above terms and responsibilities. We are an equal opportunity employer. We do not discriminate against any qualified contractors, subcontractors, suppliers. The firm must be registered with Department of Industrial Relation and should have a current DIR number.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.