Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Barbara Sasser



Project Estimator

Gabe Farncroft gfarncroft@bridgewaycci.com



Contact Information

3333 Vaca Valley Parkway, Suite 2000
Vacaville, CA 95688



Telephone

(707) 455-7033



Fax

(707) 455-7036



Bridgeway Civil Constructors, Inc.
is seeking qualified DBEss


Project Name

Construction on State Highway 101/237 in Santa Clara County Various Locations



Bid/Contract #

04-0J5604



Awarding Agency

State of California, Department of Transportation



Project Location

Various, Santa Clara County, CA



Bid Date

03/03/2021 at 14:00



Project Details

Bridgeway Civil Constructors, Inc. (Bridgeway) is an Equal Opportunity Employer and requests Subcontractor Quotes from all qualified subcontractors and suppliers including certified DBE/DVBE firms to perform commercially useful functions for the following items of work, including but not limited to:
LEAD COMPLIANCE PLAN, TIME-RELATED OVERHEAD (WDAY), DISPUTE RESOLUTION BOARD ON-SITE MEETING, HOURLY OFF-SITE DISPUTE-RESOLUTION- BOARD-RELATED TASKS, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TEMPORARY TRAFFIC STRIPE (TAPE), TEMPORARY TRAFFIC STRIPE (PAINT), CHANNELIZER (SURFACE MOUNTED), PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY, TEMPORARY PAVEMENT MARKER, PORTABLE CHANGEABLE MESSAGE SIGN (LS), TEMPORARY RAILING (TYPE K), TEMPORARY CRASH CUSHION MODULE, TEMPORARY ALTERNATIVE CRASH CUSHION, TEMPORARY RADAR SPEED FEEDBACK SIGN SYSTEM, JOB SITE MANAGEMENT, PREPARE WATER POLLUTION CONTROL PROGRAM, TEMPORARY COVER, TEMPORARY DRAINAGE INLET PROTECTION, TEMPORARY FIBER ROLL, TEMPORARY REINFORCED SILT FENCE, STREET SWEEPING, TEMPORARY CONCRETE WASHOUT, REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE), TREATED WOOD WASTE, TEMPORARY HIGH-VISIBILITY FENCE, STRUCTURE EXCAVATION (BRIDGE), MOVE-IN/MOVE-OUT (EROSION CONTROL), HYDROMULCH, FIBER ROLLS, HOT MIX ASPHALT (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE A), PLACE HOT MIX ASPHALT DIKE (TYPE C), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, STRUCTURAL CONCRETE, BRIDGE, DRILL AND BOND DOWEL, CLEAN EXPANSION JOINT, JOINT SEAL (MR 1"), JOINT SEAL (MR 1 1/2"), BAR REINFORCING STEEL (BRIDGE), FURNISH SIGN STRUCTURE (BRIDGE MOUNTED WITHOUT WALKWAY), INSTALL SIGN STRUCTURE (BRIDGE MOUNTED WITHOUT WALKWAY), REMOVE BRIDGE MOUNTED SIGN, CARBON FIBER REINFORCED POLYMER STRIPS, REMOVE POLYESTER CONCRETE OVERLAY, PREPARE CONCRETE BRIDGE DECK SURFACE, FURNISH POLYESTER CONCRETE OVERLAY, PLACE POLYESTER CONCRETE OVERLAY, BRIDGE REMOVAL (PORTION), LOCATION A, BRIDGE REMOVAL (PORTION), LOCATION B, BRIDGE REMOVAL (PORTION), LOCATION C, BRIDGE REMOVAL (PORTION), LOCATION D, BRIDGE REMOVAL (PORTION), LOCATION E, MINOR CONCRETE (CURB) (LF), REMOVE CURB, MISCELLANEOUS METAL (BRIDGE), BRIDGE DECK DRAINAGE SYSTEM, REMOVE PAVEMENT MARKER, GUARD RAILING DELINEATOR, PAVEMENT MARKER (RETROREFLECTIVE), BARRIER MARKER, OBJECT MARKER (TYPE L-1), REMOVE ROADSIDE SIGN, REMOVE ROADSIDE SIGN (STRAP AND SADDLE BRACKET METHOD), REMOVE SIGN PANEL, FURNISH LAMINATED PANEL SIGN (1"-TYPE A), FURNISH SINGLE SHEET ALUMINUM SIGN (0.063"-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED), FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-FRAMED), ROADSIDE SIGN - ONE POST, ROADSIDE SIGN - TWO POST, INSTALL SIGN (STRAP AND SADDLE BRACKET METHOD), INSTALL ROADSIDE SIGN PANEL ON EXISTING POST, MIDWEST GUARDRAIL SYSTEM (WOOD POST), VEGETATION CONTROL (MINOR CONCRETE), CHAIN LINK RAILING (TYPE 7 MODIFIED), SINGLE THRIE BEAM BARRIER (WOOD POST), TRANSITION RAILING (TYPE STB), TRANSITION RAILING (TYPE WB-31), END CAP (TYPE TC), END ANCHOR ASSEMBLY (TYPE SFT), ALTERNATIVE IN-LINE TERMINAL SYSTEM, CONCRETE BARRIER (TYPE 60M), CONCRETE BARRIER (TYPE 60M MODIFIED), CONCRETE BARRIER (TYPE 842 MODIFIED), REMOVE GUARDRAIL, SALVAGE CONCRETE BARRIER (TYPE K), REMOVE CONCRETE BARRIER (TYPE 50), REMOVE CRASH CUSHION, CONCRETE BARRIER (TYPE 842A MODIFIED), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 18-12), 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), 8" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) (BROKEN 12-3), REMOVE THERMOPLASTIC TRAFFIC STRIPE, 6" TRAFFIC STRIPE TAPE (WARRANTY), 6" TRAFFIC STRIPE TAPE WITH CONTRAST (WARRANTY), 8" TRAFFIC STRIPE TAPE WITH CONTRAST (WARRANTY), MODIFYING LIGHTING SYSTEMS, REMOVING LIGHTING SYSTEMS, MOBILIZATION



All items of work are made available including items of work normally performed by Bridgeway. Items included in quotations will be broken down into comparable packages as necessary to assist in identifying opportunities for DBE and DVBE Subcontractors.
Requirements: Bridgeway is signatory to the Carpenters, Cement Masons, Laborers and Operating Engineers unions. Subcontractors must be prepared to furnish payment and performance bonds for the full amount of subcontract price. Bonding assistance is available. Subcontractors must possess a current contractor's license, insurance and worker's compensation coverage meeting Bridgeway's requirements and will be required to sign the standard Bridgeway Subcontract Agreement. Please call the main office for a copy of the insurance requirements and agreement. Please include your Contractors License Number, DIR Number and your DBE Firm ID Number on the quote. Plans and specifications are available for viewing at our office. Please call if you need any help or assistance bidding this project including but not limited to; obtaining bonding, insurance, equipment, materials and/or supplies.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.