Village of Red Hook Sewer Project
1G
Village of Red Hook
Red Hook , Dutchess County, NY
02/26/2021 at 2:00
D.A. Collins Construction Co., Inc. welcomes quotes from all qualified subcontractors, services, material suppliers, and trucking firms for complete or portions of the work for all phases.
The work includes but is not limited to; installation of a new 50,000 gpd wastewater treatment plant; installation of a sewer forcemain collection system with approximately 15,000 feet of 2", 3", 4" and 6" HDPE sewer installed by excavation and directional drilling, along with air release valves, isolation valves and cleanouts; installation of 131 septic tank effluent pump systems including the septic tanks, pumps, controllers and interconnecting wiring), along with 1-1/2" HDPE sewer service laterals and shutoffs; connections to existing building sewers; installation of effluent pump control panels along with installation and interconnection of power and control connections to the effluent pumps; installation of grease traps; abandonment and removal of existing septic tanks, cess pools, drywells and leach fields impacted by new construction; miscellaneous related work; and total site restoration.
Plans and specifications may be obtained using the following link:
Access is given to the following site for the sole purpose of providing information to assist the addressee in providing quotations regarding the reference project. Neither D.A. Collins Construction Co., Inc. nor the D.A. Collins Companies provide any guarantees or assume any responsibility as to the completeness or accuracy of the information provided. By accessing the site, the addressee agrees not to share user names, passwords or any information provided.
ftp://ftp.dacollins.net/DA%20Collins/Bids/2021-02-February/D21-0008%20Village%20of%20Red%20Hook%20Sewer%20Project/
Username: dacguest2
Password: dac2222
Each bidder shall take note of the following:
• Any subcontracts, agreement for services or purchase orders will be subject to the Owner's mandatory contract flow down requirements.
• Insurance Requirements: Please be sure to review the insurance requirements. Subcontractors will be required to fulfill these requirements.
• Equal Employment Opportunity: The Subcontractor shall undertake or continue existing programs of affirmative action to ensure that minority group members and women are afforded equal employment opportunities. It is the responsibility of all subcontractors to undertake good faith efforts to assist D.A. Collins Construction Co., Inc. in achieving the workforce participation goals established for this project. Goals: Minority 17.00% and Female 6.90%
• Prevailing Wage Rates: This is a public works project; therefore, prevailing wage rates are applicable. Use this link to access rates.
https://applications.labor.ny.gov/wpp/doFindProject.do?method=doIt&prcNumber=2021000273
• In submitting a quote, the vendor assures that there is no conflict of interest or detrimental effect in accordance with Article 6 of the Proposal.
• In order to comply with New York State contracts Article 19, all subcontractors/vendors will be required to provide names of any former New York State employees in their employment.
Please complete and return the attached Solicitation Response Form to DACEstimating@dacollins.com to show your interest and availability for participation in this contract. This form is required by federal programs. If you are available and interested in participation, it is recommended that you prepare and submit to us quotations for the items of work you would be able to perform.