Sullivan Phase 1: New Restroom Building, Library Remodel & Parking Lot
21F-131
Fairfield-Suisun Unified School District
Fairfield, Solano County, CA
02/24/2021 at 03:00
SCOPE: Renovation of (E) classroom into a library. Construct a new parking lot and parent drop-off lane, replace ADA ramps, install fencing & additional site work as described in the plans & specs.
Prevailing Wage Required / 5% Retention / See Section 13.1.3 of GCs 00 70 00 & 7 of Special Conditions 00 71 00 for Insurance Requirements / District RFI Deadline is 2/16/21 by 4PM / MEP&FS Subs MUST be Prequalified to Bid - deadline to submit is 2/8/21 https://www.fsusd.org/Page/16414 / Duration is 4/1/21 - 9/30/21 / Liquidated Damages are $1,000/Day
Subcontractors must be registered with the DIR to bid on this project https://www.dir.ca.gov/dlse/dlsePublicWorks.html
It is now State of CA law to provide CSLB license #'s & DIR #'s on sub lists - make sure to have them on your bid scope!
Alten Construction may implement a CCIP (Contractor Controlled Insurance Program) on this or any Project
Subcontractors & Suppliers are required to comply with Alten's standard subcontract(s) which can be found on our website www.altenconstruction.com
TRADES NEEDED (but not limited to): Demo; Earthwork; Erosion Control; Asphalt Paving; Pavement Markings; Site Signage; Fences & Gates; Site Concrete; Rebar; Bldg Concrete; Structural & Misc Steel; Rough Carpentry; Finish Carpentry; Cabinets; Insulation; Membrane Roofing; Metal Roofing; Sheet Metal Flashing; Vapor Barriers; Joint Sealants; Doors, Frames & Hardware; Cement Plaster; Gypsum Board; Ceramic Tile; Acoustical Tile; Carpet & Resilient Flooring; FRL Panels; Painting; Epoxy Flooring; Marker & Tackboards; Signage; Toilet Accessories & Partitions; Window Coverings; Plumbing; HVAC; Electrical; and Fire Alarm.
Plans & Specifications are available for review and take-off in our office. Email bids@altenconstruction.com to request download access from Procore. In order for bids to be considered, they must be received at our office by mail, phone or fax one (1) hour prior to bid closing time. PREVAILING WAGE RATES, INSURANCE FORM CG2010 11/85 (EQUIVALENT IS CG2010 0704 & CG203 COMBINED) & WEEKLY CERTIFIED PAYROLL REPORTS ARE REQUIRED. 100% PERFORMANCE & PAYMENT BONDS MAY BE REQUIRED. ALTEN CONSTRUCTION, INC. WILL PAY UP TO 1.5% OF BOND PREMIUM. WE ARE AN EQUAL OPPORTUNITY EMPLOYER.