Kara Gwin
Shelby VanAssche
2200 Columbia House Blvd
Vancouver, WA 98661
(360) 693-1478
(360) 693-5582
North Indio Flood Control Project-Phase 2
2020-56
Coachella Valley Water District
Indio, Riverside County, CA
08/18/2021 at 14:00
Services and supplies being solicited include: concrete aggregates, concrete supplies, ready mix concrete, class II aggregate base, asphalt concrete paving, pavement marking, signs, traffic signals, traffic control, trucking, rebar, electrical, uniformed security services, well removal/installation, septic tank removal, fencing, potholing, geotechnical observation, shoring/trench protection, dust control, curb and gutter, driveway paving, precast structures, reinforced concrete pipe, landscape and irrigation, lake reconstruction design, dry utility relocation, survey, welding, dirt disposal.
Specifications and plans are available from the owner's website: https://pbsystem.planetbids.com/portal/16339/bo/bo-detail/82232#bidInformation
Any business supplying a subcontract quote for this project must be registered with Department of Industrial relations pursuant to Labor Code Sections 1725.5 and 1771.1.
In order to assist disadvantaged business enterprises, where feasible we will divide items of work into smaller tasks or quantities and establish delivery and construction schedules which will permit maximum participation.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.