Taylor Partee
Colin Larkin
132 South Maple Ave
South San Francisco, CA 94080
(650) 267-5297
(650) 267-5301
Sewer Collection System Pipeline Rehabilitation & Replacement Project Phase 6
45-146.06
Oro Loma Sanitary District
San Lorenzo, Alameda County, CA
09/01/2021 at 02:00
JMB Construction, Inc is seeking qualified MBE`s and WBE`s for the following (but not limited to) scopes of work:
Sawcutting, Trucking, AC Paving, Traffic Control, Concrete Flatwork, Cleaning and video Inspection of sewers.
Work includes: Phase 6- The replacement of 11,272 linear feet of 6 and 8-inch vitrified clay pipe (VCP) with
8-inch high density polyethylene pipe (HDPE); 4,624 linear feet of 8-inch VCP with 10-inch
HDPE pipe; 127 linear feet of 21-inch VCP with 24-inch HDPE pipe; and the reconnection of
all laterals and re-channelization of all manholes, as shown on the plans and specifications.
Plans & Specs are available for review in our office or online at http://engr.oroloma.org/projects. Performance & Payment Bonds may be required. Please contact our office for assistance with bonding, insurance and lines of credit.
JMB Construction, INC. 132 South Maple Avenue, South San Francisco, CA 94080. Phone: (650) 267 5300 Fax: (650) 267 5302
An Equal Opportunity Employer
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.