Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Christine Busey



Project Estimator

David Annucci



Contact Information

1000 Main Street
New Rochelle, NY 10801



Telephone

(914) 739-1908



Fax

(914) 739-5787



Tutor Perini Corporation
is seeking qualified DBEss


Project Name

New Anaerobic Digester Facilities at Hunts Point Wastewater Treatment Plant



Bid/Contract #

HP-238



Awarding Agency

DEP



Project Location

Hunts Point, Bronx County, NY



Bid Date

09/30/2021 at 10:00



Project Details

Invitation to Bid for DBE Firms


Tutor Perini Corporation, an EEO Employer, is currently soliciting cost proposals from Qualified and Certified DBE subcontractors / vendors / service providers, for Contract HP-238 - NEW ANAEROBIC DIGESTER FACILITIES AT HUNTS POINT WASTEWATER TREATMENT PLANT PROJECT, Hunts Point, New York. Client: New York City DEP. Bid Date: September 30, 2021. ALL QUOTATIONS ARE DUE BY COB FRIDAY, September 24, 2021. For further information concerning Subcontracting and/or Purchasing opportunities and to register as a subcontractor / vendor please respond to solicitations@tutorperini.com or contact Jackie Cotto (914) 739-1908. Come and join our Team!





Work Included in the Contract

1. Contract Name: HP-238 Hunts Point WWTP New Anaerobic Digester Facilities
2. The following is a general description of Work under this Contract only and shall not be construed as a complete description of the Work to be performed.
3. Principal Items of Work:
a. Site clearing and hazardous/non-hazardous soil excavation and disposal.
b. Excavation dewatering and treatment and disposal of groundwater.
c. Stabilization of excavation system consisting of sheeting, shoring, steel sheet piling and secant piles.
d. Site grading
e. Four (4), 3.2 million gallon, post-tensioned, cast-in-place concrete digesters measuring eighty-two (82)-feet in interior diameter and approximately eighty-nine (89)-feet in sidewall height with concrete covers equipped with five (5) manways and four (4) sample ports. Digester tanks include aluminum cladding system over exterior sprayed foam insulation barrier.
f. Cast-in-place concrete, partially buried equipment gallery at the base of the digesters constructed on a matt foundation at a finished floor elevation at twelve (12.0)-feet NAVD88.
g. Single-story gas room above the equipment gallery with an approximately four thousand two hundred thirty-four (4,234) square-foot footprint, with elevated cast-in-place concrete floor 356 DETAILED SPECIFICATION 01110 - SUMMARY OF WORK CONTRACT HP-238 01110-3 03/01/2021 DEP REVISED 4/25/2018 slabs supported by reinforced concrete columns, masonry exteriors and concrete roof slab.
h. Single-story control building above the equipment gallery with an approximately four thousand four hundred sixty-six (4,466) square-foot footprint, with an elevated cast-in-place concrete floor slab supported by reinforced concrete columns, masonry exteriors and concrete roof slab.
i. Single story, above ground digester feed pump station with an approximately fifty-five hundred (5,500) square-foot footprint, with a grade level cast-in-place concrete floor slab, reinforced concrete columns and beams, masonry exteriors and concrete roof slab. j. Two (2) stairway towers, from equipment gallery to top of digesters with structural steel and cast-in-place concrete columns and beams, masonry exteriors and a concrete roof slab.
k. Prefabricated guardhouse at the new plant gate near the intersection of Ryawa Avenue and Manida Street.
l. Prefabricated, walkway bridges between digester tanks and stairway towers with a canopy roof.
m. Below grade, cast-in-place concrete pipe chase between the existing thickener building and new digester facility.

n. Digester feed system consisting of ductile iron piping from the discharge of each active gravity thickener discharge pump to two (2) mechanically mixed digester feed wells located west of the thickener building and digester feed pump station equipped progressing cavity digester feed pumps that discharge from the feed wells to the sludge digesters.
o. Sludge heating system including hot water supplied from the existing boiler facility in the Main Building, hot water pumps, hot water supply and return piping and tube-in-tube-style heat exchangers. Sludge heating secondary loop that includes hot water pumps, supply and return piping and heat exchangers. Sludge heating loop that includes one (1) tube-in-tube sludge heat exchanger and one (1) screw centrifugal-type sludge recirculation pump per digester, with a swing pump as a spare for each pair of digesters.
p. Digester mixing system consisting of four (4), twenty (20) horsepower mechanical draft tube mixers per digester. 357 DETAILED SPECIFICATION 01110 - SUMMARY OF WORK CONTRACT HP-238 03/01/2021 01110-4 DEP REVISED 4/25/2018
q. Digested sludge conveyance system consisting of cast-in-place concrete sludge overflow boxes constructed to the exterior sidewalls of the digester tanks, digested sludge piping and valves, progressing cavity and recessed impeller sludge conveyance pumps and pipe connection to existing sludge transfer header.
r. Digester gas system consisting of two (2) dual pressure/vacuum relief assemblies with flame traps and safety selector valves on each digester, stainless steel digester gas piping, valves, overhead digester gas piping and support system, condensate and sediment removal equipment, three condensate control rooms, gas meters, four (4) waste gas burners located on a concrete pad west of the thickener building and pipe connection to existing digester gas piping immediately upstream of the outdoor digester gas boosters located south of the Main Building.
s. Seal water system that includes skid mounted break tank, pumps, piping, valves and appurtenances and piping and valves to process pumps.
t. Service water system that includes skid mounted break tank, pumps, piping, valves and appurtenances and piping and valves to process pumps.
u. Electric power service for the new digester facility will be supplied from the switchgear 1512 and 1515 located in the existing Main Electrical Substation Building. A new buried electric ductbank will be run from the Main Electrical Substation Building to the pipe support bridge and the conduit will then be run on the pipe support bridge to the New Digester Facility Control Building to supply four thousand one hundred sixty (4,160) volt power. Control Building equipped with one (1) four thousand one hundred sixty (4,160) volt unit substation (USS) with main-tie-tie-main configuration Electrical room of Control Building equipped with main-tie-tie-main configured MCCs, four hundred eighty (480)/two hundred seventy-seven (277) volt panelboards for some four hundred eighty (480) volt loads, stepdown transformers and panelboards for two hundred eight (208)/one hundred twenty (120) V loads. Additionally, electrical Work includes lighting, grounding, electrical power distribution to all motors, instruments, lighting and panels.





Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.