Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Heidi Faria



Project Estimator

Jean Sicard



Contact Information

1520 Fourth Street
Berkeley, CA 94710



Telephone

(510) 526-3424 ext. 3446



Fax

(510) 526-0990



O.C. Jones & Sons, Inc.
is seeking qualified DBEss


Project Name

Excavation, HMA, structural concrete, minor concrete and drainage



Bid/Contract #

#04-0A7724



Awarding Agency

Caltrans



Project Location

Berkeley & Albany, Alameda County, CA



Bid Date

11/04/2021 at 14:00



Project Details

We are soliciting quotes for (including but not limited to):
Trucking, Temporary and Permanent Hydroseed and Erosion Control
Measures, QC/QA Testing, Lead Compliance Plan, Develop Water Supply, Surface Movement Monitoring, Construction Area Signs, Traffic Control System, Type II & III Barricade, Portable Delineator, Plastic Traffic Drums, Portable Changeable Message Sign, Alternative Temporary Crash Cushion, SWPPP, Rain Event Action Plan, Storm Water Sampling, Analysis and Report, Sweeping, Temporary Active Treatment System, Treated Wood Waste, Noise Monitoring, Temporary High Visibility Fence, Clearing & Grubbing, Roadway Excavation (Type Z-2 Aerially Deposited Lead), Structure Excavation, Structure Backfill, Lean Concrete Backfill, Lightweight Cellular Concrete Backfill, Decorative Boulders, Rock Blanket, Rock Surfacing, Planting & Irrigation, Hydroseed, Compost, AC Dike, Tack Coat, Cold Plane AC, Steel Soldier Pile, Permanent Steel Casing, CIDH Concrete Pile, High Density Polyethylene Pipe, Ductile Iron Pipe, Wrought Iron Fence, Structural Concrete, Fractured Granite Texture, Bar Reinforcing Steel, Sign Structure, Pedestrian Barricade, Timber Lagging, Underground, Imported Biofiltration Soil, Trash Barrier Rack, Geocomposite Drain, Geomembrane (Water Barrier), Drainage Inlet Marker, Adjust Utilities, Rock Slope Protection, Minor Concrete, Detectable Warning Surface, Guard Shack Pad Minor Concrete, Pre/Post Construction Surveys, Misc. Iron & Steel, Isolation Casing, Misc. Metal, Signal & Lighting, Remove Sanitary Sewer, Monument, Prepare & Paint Concrete, Concrete Star Nosing, Fencing, Gates, Delineator, Pavement Marker, Roadside Signs, Midwest Guardrail System, Handrailing, Cable Railing, Concrete Barrier, Striping & Marking, Maintain Existing Traffic Management System Elements During Construction, Modify Ramp Metering Systems, Modify Traffic Monitoring Systems, Modify Camera Systems, and Construction Materials



Jean Sicard (510-809-3411 jsicard@ocjones.com) is the estimator on this project and he is available to provide assistance or answer questions regarding the project scope of work including bid requirements, break out of bid items, plan or spec interpretation, bonding or insurance requirements, and other bid assistance. Plans and specs are available to review at our Berkeley office, or can be sent out via Building Connected. Plans are also available under the Advertised Projects tab at the Caltrans website at: http://ppmoe.dot.ca.gov/des/oe/contract-awards-services.html. PDF format quotes should be emailed to the estimator or faxed to 510-526-0990 prior to 12:00 PM on the date of the bid. Quotes from DBE Subcontractors, Suppliers and Truckers are highly encouraged. OCJ is willing to breakout any portion of work to encourage DBE participation. Subcontractors must possess a current DIR, Contractors License, and insurance and workers compensation coverage including waiver of subrogation. OCJ may require Performance and Payment bonds on subcontracts. OCJ will pay the bond premium up to 2% of the contract value. Please contact OCJ for any assistance required by your firm in obtaining bonding or insurance. The US Small Business Administration may also assist you in obtaining bonding - please see the following site for information: http://www.sba.gov/content/contractors. Visit the California Access to Capital Program Financing Solutions website for additional resources for your small business - http://www.calbizfinance.org/cal_cert_biz_program.html. OCJ is available to help obtain necessary equipment, material and/or supplies. All subcontractors are required to execute OC Jones' standard subcontract agreement, comply with all insurance requirements, and name OCJ as additional insured. Copies of our agreement and insurance requirements are




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.