Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Jared Wright



Project Estimator

Jared Wright



Contact Information

401 Derek Place
Roseville, CA 95678



Telephone

(916) 757-1000



Fax

(916) 797-7400



Flint Builders, Inc.
is seeking qualified DVBEss


Project Name

South Valley Middle School, Phase 2- New Gym and Admin. Buildings



Bid/Contract #

TBD



Awarding Agency

Gilroy Unified School District



Project Location

Gilroy, Santa Clara County, CA



Bid Date

12/01/2021 at 02:00



Project Details

Project Description: Phase 2, Increment 1 includes the construction of a new 25,000 SF Administration Building. Phase 2, Increment 2 includes the construction of a new 17,000 SF Gymnasium Building. The site improvements are under construction in a previous phase. The work includes the following trades: Building Concrete, Masonry, Structural Steel, Metal Decking, Rough Carpentry, Millwork, FRP, Insulation and Firestopping, Single-Ply Roofing, Standing Seam Metal Roofing, Metal Wall and Soffit Panels, Architectural Sheetmetal, Joint Sealants, Joint Covers, Doors, Frames, and Hardware (FOB), Overhead Doors, Glazing, Cement Plaster, Composite Modular Wall Panels, Gypsum Board, Tile, Acoustical Ceilings and Wall Panels, Soft Flooring, Epoxy Flooring, Athletic Wood Flooring, Vinyl Wallcoverings, Paint, Visual Displays, Signage, Operable Partitions, Toilet Specialties, Music Storage and Sound Rooms, Stage Curtains, Foodservice Equipment, Athletic Equipment, Telescoping Bleachers, Window Coverings, Wheelchair Lifts, Final Cleaning, Scaffolding, Fire Suppression, Plumbing/HVAC, and Electrical.



Plans & Specifications: DSA Submittal Plans and Specs shall be available on November 8, 2021 for bidding.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.