Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

gpiestimating@garney.com



Project Estimator

Matt Roberts



Contact Information

324 E 11th St, Suite E2
Tracy, CA 95376



Telephone

(925) 800-1848



Fax

(000) 000-0000



Garney Pacific Inc
is seeking qualified DBEs, MBEs, WBEs, SBEs, DVBEss


Project Name

8748 - Strom Drain System Improvements Project



Bid/Contract #

8748



Awarding Agency

City of San Jose



Project Location

San Jose, Santa Clara County, CA



Bid Date

11/04/2021 at 03:00



Project Details

GARNEY PACIFIC INC. REQUESTS QUOTES FROM ALL QUALIFIED DBE/SBE/WBE SUBCONTRACTORS AND MATERIAL SUPPLIERS FOR:
8748 - Storm Drain System Improvements Project
Owner: City of San Jose
Location: San Jose-Santa Clara Regional Wastewater Facility
Engineers Estimate: $7,946,443
BID DATE: NOVEMBER 4, 2021 AT 3:00 PM
Please submit quotes no later than 30 mins prior to the bid date/time.
We are requesting quotes from all qualified DBE/SBE/WBE Subcontractors and Suppliers for the following, but not limited to:
SWPPP*Earthwork*Cathodic Protection*Traffic Control*Trucking*Aggregates*Shoring*CIP Concrete*Rebar*ConcreteSupply*Precast*Masonry*Structural/Misc.Metals*Painting/Coating*Signage *Pumps*Pipe Supports*Mech. Piping*Electrical*Instr./Controls*Saw cutting*Pipe Supply*Valve Supply*Fencing*Striping*Shotcrete*Pipe Cleaning*TV Inspection*Biologist*Scheduling*Haz Mat, etc.
Project Description: The Project generally involves rehabilitation of storm drain system, sanitary system, and seven stormwater pump stations at the San Jose-Santa Clara Regional Wastewater Facility.



Project Information: Project Documents are available for your review at our office or you can send request of interest in this project to gpiestimating@garney.com and we will send you a link to the specs/plans.
Outreach Terms & Requirements:
Garney will provide FIRMS, if requested, with required assistance in bonding, insurance. Quotes per project bid items must be submitted before the due bid date and time to allow proper evaluation. Quotes are required to be in accordance with project plans, specs, and good for the entire contract duration. This project is a prevailing wage public job. The FIRM's quote must consider all terms related to prevailing wages terms. FIRMS must possess and maintain a current contractor license, insurance, and worker compensation coverage during the project. 100% payment bond and performance bond for the full amount of the subcontract price may be required. FIRMS that submit their quote explicitly acknowledge and agree to all above terms and responsibilities. We are an equal opportunity employer. We do not discriminate against any qualified contractors, subcontractors, supplier the firm must be registered with Department of Industrial Relation and should have a current DIR number.
Please note that Garney Pacific Inc. is signatory to the Laborers and Operators Unions
This is part of a Good Faith Outreach
Your response is greatly appreciated
An Equal Opportunity Employer




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.