Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Valorie McCauley



Contact Information

111 Pelican Way
San Rafael, CA 94901



Telephone

(415) 453-3732 ext. 10



Fax

(415) 457-5820



Valentine Corporation
is seeking qualified DBEss


Project Name

Fryer Creek Pedestrian & Bicycle Bridge Project



Bid/Contract #

Contract #1802 - Federal Contract # CML - 5114 (020)



Awarding Agency

City of Sonoma



Project Location

Sonoma, Sonoma County, CA



Bid Date

11/05/2021 at 02:00



Project Details

SHEETING, SHORING & BRACING; TEMPORARY EXCLUSION FENCE, PRE CONSTRUCTION SURVERSY, WORKER AWARENESS TRAINING, TRAFFIC CONTROL, CONSTRUCTION AREA SIGNS, PREPARE WATER POLLUTION CONTROL PROGRAM, WATER POLLUCTION CONTROL IMPLEMENTATION, CONFORM GRIND HMA PAVEMENT, REMOVE CONCRETE, ASPHALT PAVEMENT & FENCE; REMOVE OR SALVAGE BARRICADE, ADJUST MANHOLE COVER TO GRADE, CLEARING & GRUBBING; REMOVE TREE, ROADWAY EXCAVATION, REMOVE UNSUITABLE MATERIAL - MISC. CONCRETE & ROADWAY SECTION, SEED & STRAW MULCH; CLASS 2 AGGREATE BASE, HOT MIX ASPHALT & DIKE, HELICAL ANCHORS, STRUCTURAL CONCRETE, BAR REINFORCING STEEL, MINOR CONCRETE, PREFABRICATED STEEL TRUSS BRIDGE, RELOCATE AIR RELEASE VALVE, WATER MAIN PROTECTION, CHAIN LINK FENCE & GATE; BOLLARDS, ROADSIDE SIGNS - ONE POST & SSBM; DEAD-END BARRICADE, OBJECT MARKERS, PAVEMENT MARKINGS, STRIPING, PAINT CURB, STREE LIGHT CONDUIT & PULL BOXES; & SUBGRADE ENHANCEMENT GEOTEXTILE.



Bonds may be required, if so, Valentine Corporation can assist. A 100% payment bond and performance bond may be required for the full amount of the subcontract price. Please provide a bond premium rate with your quote. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, and materials or related assistance in services, please contact our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractor's license, insurance and worker's compensation coverage meeting Cal Trans requirements and will be required to sign the standard Valentine Corporation Subcontract Agreement. Plans and specifications are available to be viewed in our office located at 111 Pelican Way San Rafael between 8:00 AM and 3:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Valentine Corporation is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. Valentine Corporation intends to work cooperatively with all qualified firms seeking work on this project.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.