Colette Slaman
150 Clove Road, 11th Floor
Little Falls, NJ 07424
(201) 691-6000
(201) 691-6001
PANYNJ Newark Liberty International Airport AirTrain Replacement Project
RFP #70027
Port Authority of New York and New Jersey (PANYNJ)
Newark, Union and Essex County, NJ
05/26/2022 at 12:30
Be aware that we are unable to share Owner-produced or Contractor-produced documents until we receive fully executed PANYNJ and Liberty AirTrain Confidentiality/NDA documents.
Please direct any project-specific inquiries to Colette Slaman at cslaman@walshgroup.com.
We require all subcontractors quote with Union Labor and note that there is a diversity goal of 20% MBE and 10% WBE. Additionally there is a 3% SDVOB and 10% LBE participation goal.
As a member of Liberty AirTrain Partners, Walsh-Tully JV is seeking cost proposals for the Newark Liberty International Airport ("Newark Airport") AirTrain Replacement project. The New AirTrain system will be a critical component and centerpiece of the Newark Airport modernization. The Existing AirTrain system, which opened in 1996, has outlived its useful life and does not currently provide customers with the service reliability and modern customer service amenities expected of a world-class Automated People Mover (APM) system.
This project is a Design-Build-Operate-Maintain contract with various scopes of work. We are currently soliciting cost proposals for scopes including:
• Asphalt Milling
• Manholes/Junction Structure
• Asphalt Paving
• Masonry
• Building Demolition
• MH & Valve Adjustments
• Catch Basins
• Miscellaneous Metals
• CCTV
• Paintings/Coatings
• Communications
• Permanent/Temporary Street Lighting
• Concrete Flatwork
• Permanent/Temporary Traffic Signals
• Concrete Substructures
• Pile Driving
• CPM Scheduling Plumbing
• Curtain Walls
• QC Inspection/Material Testing
• Doors
• Reinforcing Steel
• Electrical Duct banks/Manholes/Vaults
• Sanitary Sewer
• Electrical Work
• Saw cutting
• Erection of Girders
• Signs and Foundations
• Fencing/Guardrail
• Street Sweeping
• Fire Protection
• Striping
• Guideway Demolition
• Support of Excavation
• Guideway Superstructure
• Temporary Sanitary Facilities
• Gypsum Partition Walls
• Trucking
• Hardware
• Wall Partitions
• Hardware
• Waste Containers
• Installation of Train Technology
• Water Truck/Dust Control
• Landscaping and Irrigation
• Waterlines
• Maintenance and Protection of Traffic
• Wayfinding Signs
We require all subcontractors quote with Union Labor. There will be bonding requirements for any subcontract, supply and/or service agreement exceeding $250,000.00. This contract is a CCIP with insurance requirements found in the plans and specifications.