Michael Grock
20 Stokes Dr
Mound House, NV 89706
(775) 246-1900
(775) 246-1986
Keller-Heavenly Water System Improvements, Phase 3
--
South Tahoe Public Utility District
South Lake Tahoe, El Dorado County, CA
06/07/2022 at 02:00
This project consists of installation of 1500 LF OF 8" PVC waterline, transfer of domestic water services, fire hydrant installations, demo of an existing water tank, paver access road construction, removal and replacement of 3 pressure reducing valves and vaults, instrumentation ande communication equipment, paving and curb restoration, rehabilitation and replacement of electrical equipment & piping at a booster station, and preparation for the placement of 2 backup generators.
DBE SUBCONTRACTORS AND SUPPLIERS NEEDED: Traffic Control; Surveying; CMP Project Scheduling; SWPPP & Rain Action Event Plan; Erosion & Reseeding; Demo of a 208,000 Gal. Water Tank, Demo PRV Vaults; New PRV Electrical and SCADA; Trucking and Material Supplies; Rip-Rap,Pipe & Fittings PRV Assemblies; Aggregate Base and Asphalt.
Plans are available for free download on the District's Vendor Portal. For assistance contact Star Glaze at South Lake Tahoe (530) 543-6205 or call MKD Construction, Inc. at (775) 246-1900.
MKD Construction is happy to assist interested DBEs in obtaining bonding, lines of credit or insurance, and any technical assistance of information related to or obtaining plans, specifications and requirements for the work which is provided to DBEs. MKD Construction will also assist interested DBEs in obtaining necessary equipment, supplies, materials or related assistance or services, excluding supplies and equipment the DBE subcontractor purchases or leases from us. We are a union contractor and equal opportunity employer.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.