Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Stacy Dutra



Project Estimator

Brock Kernaghan



Contact Information

17400 Clear Creek Rd.
Redding, CA 96001



Telephone

(530) 246-4292



Fax

(530) 246-9940



J. F. Shea Construction, Inc.
is seeking qualified SBEs, DVBEss


Project Name

Struct Conc Bridge, Polyester Conc Overlay & Rock Slope Protection



Bid/Contract #

02-1H5004



Awarding Agency

State of California Department of Transportation - Caltrans



Project Location

Various Locations, Trinity County, CA



Bid Date

06/01/2022 at 02:00



Project Details

J. F. Shea Construction, Inc. is requesting quotes from all qualified subcontractors and suppliers including certified DVBE firms for all items of work, including but not limited to:
1 LEAD COMPLIANCE PLAN
2 PROGRESS SCHEDULE (CRITICAL PATH METHOD)
3 TIME-RELATED OVERHEAD (LS)
4 DISPUTE RESOLUTION ADVISOR ON-SITE MEETING
5 HOURLY OFF-SITE DISPUTE-RESOLUTION-ADVISOR-RELATED TASKS
6 DEVELOP WATER SUPPLY
7 CONSTRUCTION AREA SIGNS
8 TRAFFIC CONTROL SYSTEM
9 PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMS (LS)
10 PORTABLE CHANGEABLE MESSAGE SIGN (LS)
11 AUTOMATED FLAGGER ASSISTANCE DEVICES
12 JOB SITE MANAGEMENT
13 PREPARE STORM WATER POLLUTION PREVENTION PLAN
14 RAIN EVENT ACTION PLAN
15 STORM WATER SAMPLING AND ANALYSIS DAY
16 STORM WATER ANNUAL REPORT
17 MOVE-IN/MOVE-OUT (TEMPORARY EROSION CONTROL)
18 TEMPORARY HYDRAULIC MULCH (BONDED FIBER MATRIX)
19 TEMPORARY FIBER ROLL
20 TEMPORARY CONSTRUCTION ENTRANCE (LS)
21 STREET SWEEPING
22 TEMPORARY ACTIVE TREATMENT SYSTEM
23 TEMPORARY CONCRETE WASHOUT
24 WATER QUALITY SAMPLING AND ANALYSIS DAY
25 WATER QUALITY MONITORING REPORT
26 WATER QUALITY ANNUAL REPORT
27 TEMPORARY CREEK DIVERSION SYSTEMS
28 ASBESTOS COMPLIANCE PLAN
29 TREATED WOOD WASTE
30 CONTRACTOR-SUPPLIED BIOLOGIST (LS)
31 FISH PROTECTION
32 INVASIVE SPECIES CONTROL
33 BAT AND BIRD EXCLUSION DEVICE
34 DUST CONTROL PLAN (NATURALLY OCCURRING ASBESTOS)
35 ROADWAY EXCAVATION
36 ROADWAY EXCAVATION (NATURALLY OCCURRING ASBESTOS)
37 SHOULDER BACKING
38 BONDED FIBER MATRIX (SQFT)
39 FINISHING ROADWAY
40 CLASS 2 AGGREGATE BASE (CY)
41 HOT MIX ASPHALT (TYPE A)
42 TACK COAT
43 COLD PLANE ASPHALT CONCRETE PAVEMENT
44 TEMPORARY SUPPORT
45 TEMPORARY DECKING
46 (F) - STRUCTURAL CONCRETE, BRIDGE
47 (F) - STRUCTURAL CONCRETE, BRIDGE (RSC)
48 DRILL AND BOND DOWEL
49 CLEAN EXPANSION JOINT
50 JOINT SEAL (MR 1")
51 JOINT SEAL (MR 2")
52 BONDED JOINT SEAL (MR 1 1/2")
53 (F) - BAR REINFORCING STEEL (BRIDGE)
54 (F) - BAR REINFORCING STEEL (EPOXY COATED) (BRIDGE)
55 (F) - BAR REINFORCING STEEL (STAINLESS STEEL) (BRIDGE)
56 CLEAN AND PAINT EXISTING BEARING ASSEMBLIES
57 PUBLIC SAFETY PLAN
58 CORE AND PRESSURE GROUT DOWEL
59 RAPID SETTING CONCRETE (PATCH)
60 REMOVE ASPHALT CONCRETE SURFACING
61 REMOVE POLYESTER CONCRETE OVERLAY
62 REMOVE UNSOUND CONCRETE
63 PREPARE CONCRETE BRIDGE DECK SURFACE
64 FURNISH POLYESTER CONCRETE OVERLAY
65 (F) - PLACE POLYESTER CONCRETE OVERLAY
66 BRIDGE REMOVAL (PORTION), LOCATION A
67 BRIDGE REMOVAL (PORTION), LOCATION B
68 GALVANIC ANODES
69 (F) - CONCRETE BACKFILL (PIPE TRENCH)
70 18" REINFORCED CONCRETE PIPE (CLASS III, RUBBER GASKET JOINT)
71 18" CONCRETE FLARED END SECTION
72 REMOVE CULVERT (LF)
73 REMOVE FLARED END SECTION (EA)
74 ROCK SLOPE PROTECTION VOID FILLER
75 ROCK SLOPE PROTECTION (3T, CLASS X, METHOD A) (TON)
76 (F) - MISCELLANEOUS METAL (BRIDGE)
77 DELINEATOR (CLASS 2)
78 GUARD RAILING DELINEATOR
79 MARKER (CULVERT)
80 OBJECT MARKER (TYPE L)
81 REMOVE ROADSIDE SIGN
82 FURNISH SINGLE SHEET ALUMINUM SIGN (0.080"-UNFRAMED)
83 ROADSIDE SIGN - ONE POST
84 MIDWEST GUARDRAIL SYSTEM (STEEL POST)
85 SINGLE THRIE BEAM BARRIER (STEEL POST)
86 THRIE BEAM BRIDGE RAIL (TYPE TB 115 BR)
87 THRIE BEAM BRIDGE RAIL (TYPE TBBR)
88 RECONSTRUCT TRANSITION RAILING (TYPE TR MGS)
89 RECONSTRUCT TRANSITION RAILING (TYPE TR TBB)
90 TRANSITION RAILING (MGS TO TBBR)
91 TRANSITION RAILING (TBB TO TBBR)
92 END ANCHOR ASSEMBLY (TYPE SFT)
93 ALTERNATIVE IN-LINE TERMINAL SYSTEM
94 REMOVE GUARDRAIL
95 RECONSTRUCT THRIE BEAM BARRIER
96 RECONSTRUCT TERMINAL SYSTEM (TYPE SOFT STOP)
97 6" TWO-COMPONENT PAINT TRAFFIC STRIPE
98 MOBILIZATION



J. F. Shea Construction Inc. is a union signatory contractor. Subcontractors must possess a current contractor's license, insurance coverage and worker's compensation for the entire length of the contract. All subcontractors will be required to sign our standard Subcontract Agreement. 100% payment and performance bonds may be required. Please call if you need assistance in obtaining insurance, bonding, equipment, materials and/or supplies. Plans and specifications can be viewed at our office located at 17400 Clear Creek Road, Redding, Ca. 96001 or call for any additional needed project information. J. F. Shea Construction Inc. intends to work cooperatively with all qualified firms seeking work on this project. We are an equal opportunity employer and will work with any interested subcontractor to identify opportunities to break items into economically feasible packages. Women and Minority Employees are encouraged to apply.


J. F. SHEA CONSTRUCTION, INC.
P.O. Box 494519 - Redding, CA 96049
Phone: (530) 246-4292 Fax: (530) 246-9940
An Equal Opportunity Employer




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.