Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Estimating Department



Project Estimator

Jim Petnic, Rod Barber, Mark Mahboubi



Contact Information

246 Ghilotti Ave
Santa Rosa, CA 95407



Telephone

(707) 585-1221



Fax

(707) 585-1601



Ghilotti Construction Company, Inc.
is seeking qualified DBEss


Project Name

Hwy. 680 in Alameda & Contra Costa Counties at Sunol and in San Ramon



Bid/Contract #

#04-0Q30U4



Awarding Agency

Department of Transportation (Caltrans)



Project Location

Sunol, San Ramon, Alameda & Contra Costa County, CA



Bid Date

07/28/2022 at 14:00



Project Details

Ghilotti Construction Company, Inc. is seeking certified DBE subcontractors, suppliers & truckers for construction (Precast Concrete Pavement, Electronic Toll System, JPCP, CB & Structural Concrete) on Hwy. 680 in Alameda and Contra Costa Counties at Sunol and in San Ramon between 0.4 Mile South of Calaveras Road Undercrossing to 0.9 Mile North of Alcosta Boulevard Overcrossing (04-Ala, CC-680-R11.0/R21.9, R0.0/R0.9). Quotes requested include, but are not limited to, the following scopes of work: CONSTRUCTION AREA SIGNS, ROADSIDE SIGNS, SIGN STRUCTURE, SIGNAL & LIGHTING, TRAFFIC CONTROL, DETECTOR, RAMP METERING SYSTEM, ELECTRONIC TOLL SYSTEM, FIBER OPTIC CABLE SYSTEMS, TEMP K RAIL, MOVABLE BARRIER SYSTEM, MOVABLE BARRIER CRASH CUSHION, LATERAL SHIFT OF MOVABLE BARRIER, RELOCATE MOVABLE BARRIER, RESET-ADJUST ROADWAY ITEMS, DEMOLITION / BRIDGE REMOVAL, ROADWAY EXCAVATION, STRUCTURE EXCAVATION, STRUCTURE BACKFILL, COLD PLANE, JOINTED PLAIN CONCRETE PAVEMENT, PRECAST CONCRETE PAVEMENT, DRILL AND BOND (DOWEL BAR), INDIVIDUAL SLAB REPLACEMENT (RSC), CONCRETE SURFACE TEXTURE (CRACKED LIMESTONE), ASPHALT PAVING, LEAN CONCRETE BASE, LEAN CONCRETE BASE RAPID SETTING, CONCRETE CURB & SIDEWALK - MISC., FENCING, TEMP FENCING, ESA, SILT, AC DIKE, PORTLAND CEMENT & CONCRETE PAVEMENT, GRIND & GROOVE, FABRIC & OILS, CLEAR & GRUB, STRUCTURAL CONCRETE, MINOR CONCRETE STRUCTURE, CONCRETE BARRIER, REMOVE CONCRETE BARRIER, HYDROSEED, IRRIGATION, EROSION CONTROL, CIDH PILES, JOINT SEAL, AIR-BLOWN MORTAR-SHOTCRETE, ALTERNATIVE PIPE CULVERT, CLEANING, INSPECTING, AND PREPARING CULVERT, CULVERT SLURRY-CEMENT BACKFILL, REINFORCING STEEL, METAL BEAM GUARD RAILING, METAL RAILING, THERMOPLASTIC STRIPING & PAVEMENT MARKINGS, BIOLOGIST, NATURAL RESOURCE PROTECTION PLAN, NOISE MONITORING, DUST PALLIATIVE, SWPPP PLANNING, 18" MACHINE SPIRAL WOUND PVC PIPELINER (EXPANDABLE DIAMETER), STORM DRAIN (UNDERGROUND), STREET SWEEPING, MATERIAL SUPPLIER & TRUCKING. Engineer's Estimate: $170,000,000 / DBE Goal: 26% / 700 WD / $25,300 per day LD. Submit quotes by Noon on bid date. Contact our estimator for more information. GCC is available to discuss breaking out any portion of work to encourage minority participation.



Mr. Jim Petnic, Mr. Rod Barber, and Mr. Mark Mahboubi (707/585-1221 or jimp@ghilotti.com, rod@ghilotti.com, markm@ghilotti.com) are the Estimators for this project and are available to provide you with assistance to clarify any questions regarding the scope of work, including interpretation of plans, specifications and requirements, bid preparation and obtaining bonds, lines of credit, insurance and any technical assistance. GCC may also assist in obtaining any necessary equipment, supplies, materials or related services. (Please note: GCC may require Payment & Performance Bonds on all sub-contracts over $25,000 per Ca. Public Contract Code Sect. 4108. GCC will pay bond premiums up to 1 ½% of contract cost. GCC is a UNION CONTRACTOR. Any non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.)

Plans, specifications and project requirements may be reviewed at our office in Santa Rosa. They may also be downloaded for free through the Department of Transportation via their website at http://ppmoe.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php . Plans may also be viewed or purchased through local plan rooms, builder's exchanges, or Dodge Scan. Ghilotti Construction Company encourages the use of minority and women subcontractors and suppliers and considers such to be an important aspect of the project.

Project Requirements: By submitting a proposal, the bidder affirms that they have carefully examined ALL the bidding documents/Addenda and that from his/her own investigation, they have satisfied themselves as to the nature and location of the work.
Subcontract Requirements: Subcontractors will be required to execute GCC's written subcontract. A copy is available for inspection on GCC's website: https://www.ghilotti.com/subcontractors/ and/or can be provided upon written request prior to bid submission. Inconsistent bid terms and conditions shall be void.
Union: GCC is a UNION CONTRACTOR. Non-signatory subcontractors will be required to sign an agreement for trades covered under our agreements.
Insurance:
• All bids must include compliance with GCC's Addendum A, located at: http://www.ghilotti.com/wp-content/uploads/2020/10/Addendum-A Revised-8-2020.pdf
• CGL limits of $5,000,000/occurrence at a minimum (depending on scope)
• GCC and Owner must be named as additional insured on CGL & Auto policies (form CG 20 10 11/85 or equivalent)
• Completed operations coverage
• Primary and non-contributory wording
• Waiver of subrogation on both CGL & WC policies
• Any additional costs to meet this requirement must be included in bid pricing.

***WE ARE AN EQUAL OPPORTUNITY EMPLOYER***




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.