Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Erin Hutchison



Project Estimator

Jason Muller



Contact Information

550 Greenville Road
Livermore, CA 94550



Telephone

(925) 245-1300



Fax

(925) 245-1244



FBD Vanguard Construction, Inc.
is seeking qualified DBEss


Project Name

Precast conc pvmt, electronic toll system, JPCP, CB & structural conc



Bid/Contract #

04-0Q30U4



Awarding Agency

California Department of Transportation



Project Location

Various, Alameda & Contra Costa County, CA



Bid Date

07/14/2022 at 02:00



Project Details

FBD Vanguard Construction, Inc. is requesting quotes from all subcontractors, including DBE firms, for the following items of work including but not limited to: Lead Compliance Plan, Progress Schedule (Critical Path Method), Time-Related Overhead, Dispute Resolution Board On-Site Meeting, Hourly Off-Site Dispute-Resolution- Board-Related Tasks, Safety Quality Control Manager, Develop Water Supply, Construction Area Signs, Traffic Control System, Traffic Control Supervisor, Stationary Impact Attenuator Vehicle, Type Iii Barricade, Temporary Pavement Marking (Paint), Temporary Traffic Stripe (Paint), Channelizer (Surface Mounted), Plastic Traffic Drums, Portable Radar Speed Feedback Sign System Day, Temporary Pavement Marker, Temporary Barrier System, Portable Changeable Message Sign, Temporary Automated End Of Queue Warning System (Type 2) Day, End Of Queue Monitoring And Warning With Truck Mounted Changeable Message Sign Day, Movable Barrier System, Movable Barrier Crash Cushion, Lateral Shift Of Movable Barrier, Relocate Movable Barrier, Alternative Temporary Crash Cushion, Temporary Radar Speed Feedback Sign System, Job Site Management, Prepare Storm Water Pollution Prevention Plan, Rain Event Action Plan, Storm Water Sampling And Analysis Day, Storm Water Annual Report, Move-In/Move-Out (Temporary Erosion Control), Temporary Hydraulic Mulch (Bonded Fiber Matrix), Temporary Cover, Temporary Check Dam, Temporary Drainage Inlet Protection, Temporary Fiber Roll, Temporary Reinforced Silt Fence, Temporary Silt Fence, Temporary Construction Entrance, Street Sweeping, Temporary Active Treatment System, Temporary Concrete Washout, Water Quality Sampling And Analysis Day, Water Quality Monitoring Report, Remove Yellow Thermoplastic Traffic Stripe (Hazardous Waste), Treated Wood Waste, Contractor-Supplied Biologist, Natural Resource Protection Plan, Noise Monitoring, Remove Concrete, Temporary High-Visibility Fence, Clearing And Grubbing , Dust Palliative, Roadway Excavation, Roadway Excavation (Type Z-2) (ADL), Roadway Excavation (Type Com) (ADL), Structure Excavation (Retaining Wall), Structure Excavation (Soil Nail Wall), Structure Backfill (Slurry Cement), Structure Backfill (Retaining Wall), Structure Backfill (Soil Nail Wall), Ditch Excavation, Subgrade Enhancement Geotextile, Class B2, Class 1 Paving Grid, Geosynthetic Reinforcement, Maintain Existing Planted Areas, Check And Test Existing Irrigation Facilities, Remove Irrigation Facility, Control And Neutral Conductors, 3" Plastic Pipe (Class 315) (Supply Line), 8" Welded Steel Pipe Conduit, Move-In/Move-Out (Erosion Control), Imported Topsoil , Dry Seed , Rolled Erosion Control Product, Hydromulch, Fiber Rolls, Hydroseed, Compost, Permanent Erosion Control Establishment Work, Class 2 Aggregate Subbase, Class 2 Aggregate Base, Lean Concrete Base, Lean Concrete Base Rapid Setting, Asphalt Treated Permeable Base, Base Bond Breaker, Prime Coat, Hot Mix Asphalt (Type A), Rubberized Hot Mix Asphalt (Gap Graded), Rubberized Hot Mix Asphalt-Open Graded (Open Graded Friction Course), Asphalt Binder (Geosynthetic Pavement Interlayer), Geosynthetic Pavement Interlayer (Paving Mat), Data Core, Place Hot Mix Asphalt Dike, Place Hot Mix Asphalt (Miscellaneous Area), Tack Coat, Remove Asphalt Concrete Dike, Cold Plane Asphalt Concrete Pavement, Remove Base And Surfacing, Jointed Plain Concrete Pavement, Precast Concrete Pavement, Drill And Bond (Dowel Bar), Individual Slab Replacement (Rsc), Isolation Joint Seal (Asphalt Rubber), Remove Concrete Pavement And Base, Grinding New Concrete Pavement, Soil Nail, 24"Cast-In-Drilled-Hole Concrete Pile (Light Foundation), 60" Cast-In-Drilled-Hole Concrete Pile (Sign Foundation), Structural Concrete(Retaining Wall, Barrier Slab, Drainage Inlet), Minor Concrete (Minor Structure & Backfill), Concrete Surface Texture (Cracked Limestone), Joint Seal (Type A Modified), Bar Reinforcing Steel (Retaining Wall), Structural Shotcrete, Furnish and/or Install Sign Structure (Truss), Remove Sign Structure, Alternative Pipe Culvert, Bioretention, Trash Net (End Of Pipe Connection), Trash Net (Downdrain), Plastic Pipe Wall Drain, Reinforced Concrete Pipe, Corrugated Steel Pipe, Slotted Corrugated Steel Pipe, Plastic Pipe (Edge Drain), Plastic Pipe (Edge Drain Outlet), Corrugated Steel Pipe Downdrain, Corrugated Steel Pipe Inlet, Alternative Flared End Section, 36" Precast Concrete Pipe Inlet, Abandon Culvert, Remove Overside Drain, Remove Culvert, Remove Inlet, Remove Flared End Section, Adjust Inlet, Adjust Drainage Manhole, Modify Inlet, Modify Inlet To Manhole, Remove Edge Drain, Cleaning, Inspecting, And Preparing Culvert, Culvert Slurry-Cement Backfill, Sand Backfill, 18" Machine Spiral Wound Pvc Pipeliner , Rock Slope Protection, Rock Slope Protection Fabric , Minor Concrete (Gutter) , Minor Concrete (Miscellaneous Construction), Minor Concrete (Textured Paving), Miscellaneous Iron And Steel, Signal And Lighting (City), Electronic Toll System, Remove And Replace Monument, Prepare And Paint Concrete, Temporary Fence (Type Cl-6), Chain Link Fence, Remove Chain Link Fence, Remove Pavement Marker, Guard Railing Delineator, Pavement Marker (Retroreflective), Treatment Best Management Practice Marker, Object Marker, Remove Roadside Sign, Remove Roadside Sign (Strap And Saddle Bracket Method), Remove Sign Panel, Remove Sign Overlay, Relocate Roadside Sign, Relocate Sign Panel, Furnish Laminated Panel Sign, Furnish Single Sheet Aluminum Sign, Metal (Barrier Mounted Sign), Roadside Sign, Install Sign (Strap And Saddle Bracket Method), Install Temporary Sign Overlay, Install Sign Panel On Existing Frame, Install Roadside Sign Panel On Existing Post, Install Roadside Sign, Midwest Guardrail System, Vegetation Control (Minor Concrete), Cable Railing, Transition Railing, End Cap, End Anchor Assembly , Alternative In-Line Terminal System, Alternative Crash Cushion System, Concrete Barrier, Remove Guardrail, Remove Concrete Barrier, Remove Crash Cushion (Sand Filled), Thermoplastic Crosswalk And Pavement Marking, Thermoplastic Traffic Stripe, Remove Thermoplastic Traffic Stripe, Remove Thermoplastic Pavement Marking, 12" Rumble Strip (Asphalt Concrete Pavement), 12" Rumble Strip (Concrete Pavement), Contrast Stripe Paint, Traffic Stripe Tape, Maintaining Existing Traffic Management System Elements, Fiber Optic Cable Systems, Temporary Lighting Systems, Temporary Ramp Metering Systems, Temporary Traffic Monitoring Station Systems, Modifying High Speed Weigh-In-Motion System, Modifying Lighting Systems, Modifying Signal And Lighting Systems, Modifying Ramp Metering Systems, Modifying Traffic Monitoring Station Systems, Modifying Highway Advisory Radio Systems, Mobilization, Material Suppliers, and Trucking.



FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project. All items of work may be broken down into economically feasible packages to encourage participation. A 100% payment bond and performance bond will be required. Vanguard will pay bond premium up to 2%. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Jason Muller at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting the owners requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract agreement. Plans and specifications are available to be viewed in our office located at 550 Greenville Road, Livermore, Ca 94550 between 8:00 AM and 5:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Documents are also available on the Caltrans website at the following link: http://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=04-0Q30U4. FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.