Anthony Serio
Adam Roebuck
1000 American Bridge Way
Coraopolis, PA 15108
(412) 631-1000
(412) 631-2003
Center Hill Spillway Gates & Machinery Replacement Project
#W912P521R0009
The U.S. Army Corps of Engineers (USACE), Nashville District (LRN)
Lancaster, DeKalb County, TN
07/22/2022 at 13:00
The bid submittal is scheduled for July 15, 2022 at 1:00 PM CT. We hereby request that you submit your quotation to us no later than July 13, 2022, on the items of work or materials that your company is certified to supply or perform. We encourage the participation of all 8A small business, HUBzone, SDVOB, EDWOB, and WOSB firms verified by the SBA (Small Business Administration). Please email your quotation to estimating@americanbridge.net or fax to (412) 631-2003.
The U.S. Army Corps of Engineers (USACE), Nashville District (LRN), is issuing a Request for Proposal (RFP) solicitation for a single firm fixed-price (FFP) Construction Contract for the Center Hill Dam Spillway Gates and Machinery Replacement Project near Lancaster, TN. The scope of this requirement includes the replacement of eight (8) spillway tainter gates and nine (9) gate lifting machinery setups, including, but not limited to, wire rope and drum setup, high and low-speed gear boxes, 10 hp electric motor, bull and pinion gears, and machinery base on each gate pier for the Center Hill Dam located near Lancaster, TN in DeKalb County.
Plans and specifications for this project may be obtained through our SmartBid software. Email inquiries to estimating@americanbridge.net and an email with a link will be supplied.
Scopes to be solicited include (but are not limited to) electrical, concrete supply & installation, steel fabrication (permanent and temporary works), machinery supply & installation, wire rope assembly supply, and maintenance & protection of traffic.
Your quote must conform to all requirements of the bid documents, including but not limited to the plans, general provisions, special provisions, specifications, and contract for construction of the owner/agency (including addenda thereto) and follow all federal, state, and local laws.
If your firm is awarded the project by American Bridge Company, you will be required to execute our standard subcontract or material supply agreement and adhere to AB's standard Safety and Quality Programs, all of which is available for your review in the AB Standard Programs & Contracts folder within the project Plan Room. Subcontractors, dependent on scale of scope, may be required to furnish a conforming certificate of insurance along with payment and performance bonds before entering a subcontract, the cost of which should be included in your quotation. Suppliers, dependent on scale of scope, may be required to furnish a supply bond before entering into an agreement. If requested, assistance and/or accommodations can be made in obtaining bonding, credit, insurance, etc.
Please note that American Bridge is a safety-conscious company, and the establishment of a safe workplace will receive the utmost attention. All site personnel will be required to adhere to the safety requirements of American Bridge Company and governing agencies.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.