Mercer-Fraser Company
is seeking qualified DBEss


Project Name

Roadway Excavation, Asphalt Treated Permeable Base, HMA (Gap Graded)



Bid/Contract #

01-0G6104



Awarding Agency

Caltrans



Project Location

Fortuna, Humboldt County, CA



Bid Date

07/13/2022 at 14:00



Project Details

LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, STATIONARY IMPACT ATTENUATOR VEHICLE, PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMS, PORTABLE CHANGEABLE MESSAGE SIGN, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, RAIN EVENT ACTION PLAN, STORM WATER SAMPLING AND ANALYSIS DAY, STORM WATER ANNUAL REPORT, TEMP MULCH, TEMP DRAINAGE INLET PROTECTION, TEMP FIBER ROLL, STREET SWEEPING, TEMP CONCRETE WASHOUT, CLEARING AND GRUBBING, ROADWAY EXCAVATION, SOIL DECOMPACTION, SOIL AMENDMENT, ORGANIC FERTILIZER, PLANT (GROUP B), PLANT ESTABLISHMENT WORK, WOOD MULCH, FOLIAGE PROTECTOR, TEMP IRRIGATION SYSTEM, HYDRAULIC BIOTIC GROWTH MEDIUM, FIBER REINFORCED MATRIX, COMPOST, INCORPORATE MATERIALS, PERMEABLE AGGREGATE BASE, GEOSYNTHETIC REINFORCED (GEOMEMBRANE), ASPHALT TREATED PERMEABLE BASE, HOT MIX ASPHALT (TYPE A & GAP GRADED), PLACE HOT MIX ASPHALT (MISC AREA), TACK COAT, REMOVE BASE AND SURFACING, STRUCTURAL CONCRETE, DRAINAGE INLET, 24" PLASTIC PIPE, 3" PLASTIC PIPE (EDGE DRAIN), ABANDON CULVERT, REMOVE CULVERT, ADJUST FRAME AND GRATE TO GRADE, MODIFY INLET, MISCELLANEOUS IRON AND STEEL, VEGETATION CONTROL (MINOR CONCRETE), BARRIER MARKERS, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, LIGHTING SYSTEM, MODIFYING LIGHTING SYSTEMS, REMOVING LIGHTING SYSTEMS



Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.