Erin Hutchison
Marcus Hanson
550 Greenville Road
Livermore, CA 94550
(925) 245-1300
(925) 245-1244
East Sunnyvale Area Sense of Place
TR-18-04
Sunnyvale
Sunnyvale, Santa Clara County, CA
07/06/2022 at 03:00
FBD Vanguard Construction, Inc. is requesting quotes from all certified DBE firms for the following scopes of work including but not limited to: Potholing, Construction Staking, Traffic Control System, Clear & Grub, Monument Preservation, Excavation, Grading, Remove Concrete, Remove Signs & Post, Remove & Replace White Picket Fence, Adjust Sanitary Sewer Manhole Cover, Adjust City SD Manhole, Relocate City Water Valve, Relocate Fire Hydrant, Adjust City Drain Inlet, Adjust Irrigation Equipment, Retrofit Existing SD Inlet, Remove Tree & Stumps, Temp. Erosion Control, Hot Mix Asphalt, Class II AB, Ready Mix Concrete, Storm Drain Inlet, Storm Drain Pipe, Fire Water Ductile Iron Pipe, Bus Stop Bench, Storm Drain Overflow Inlet, Storm Drain Connection, Storm Drain Bioretention Cleanout, Storm Drain Perforated Pipe, Thru-Curb Storm Drain Inlet, Energy Dissipating Rock Mulch, Irrigation System, Soil Amendments, Earthwork, Meter & Backflow, Landscaping, Bioretention Area, Bark Mulch, 90 Day Establishment, Traffic Signal and Lighting System Modification, Street Light Poles, Pedestrian Crossings, Signing, Striping, Crack Seal, Slurry Seal.
A 100% payment bond and performance bond will be required. Vanguard will pay bond premium up to 2%. If you have any questions, need assistance in obtaining bonding, lines of credit, insurance, equipment, supplies, materials or related assistance in services, please contact Jason Muller at our office. Please note that no contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)]. Subcontractors must possess a current contractors license, insurance and workers compensation coverage meeting the owners requirements and will be required to sign the standard FBD Vanguard Construction, Inc. subcontract agreement. Plans and specifications are available to be viewed in our office located at 550 Greenville Road, Livermore, Ca 94550 between 8:00 AM and 5:00 PM Monday through Friday by appointment or you can send a request for this project and we will send you the specs/plans. Bid documents are also available at the following website: https://www.demandstar.com/app/agencies/california/city-of-sunnyvale/procurement-opportunities/e9a860f4-8f17-43af-aae7-e5dc8389f36e/. FBD Vanguard Construction, Inc. is an equal opportunity employer. We do not discriminate against any qualified employee, applicants for employment, subcontractors or vendors regardless of age, race color, creed, religion, sex, sexual orientation, marital status, national origin, military service disabilities, disable veterans or Vietnam era veteran status. If you need any assistance, please do not hesitate to call our office. Items of work may be broken down into economically feasible packages to encourage participation. FBD Vanguard Construction, Inc. intends to work cooperatively with all qualified firms seeking work on this project.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.