Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Jeanne Tulley



Project Estimator

Alison Bulman



Contact Information

1365 Main Street
Waltham, MA 2451



Telephone

(617) 913-0217



Fax

(617) 218-5901



Skanska USA Civil
is seeking qualified DBEss


Project Name

Duxbury Routh 3 NB and SB over Franklin Street



Bid/Contract #

23B-04



Awarding Agency

MassDOT



Project Location

Duxbury, Suffolk County, MA



Bid Date

06/07/2023 at 11:00



Project Details

Many bidding opportunities are available. The proposed project consists of the construction of new Route 3 northbound bridge and southbound bridges over Franklin Street. The existing bridges will be demolished, and the approach roadways reconstructed. The new bridge spans are proposed to have approximately 72-foot single spans and provide a minimum of 16’-6” vertical clearance over Franklin Street. The proposed paved roadway widths are 56 feet each, with 12-foot travel lanes, an 18-foot inside shoulder and a 14-foot outside shoulder. The increased vertical clearances require the approaches to the bridges be reconstructed to meet the new bridge elevations. Franklin Street will be reconstructed within the project limits with full-depth pavement, new curbing, and sidewalks.



Will be sent upon request.




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.