Maria Villegas
4710 Elmwood St #6
Phoenix, AZ 85040
(951) 336-7076
(951) 336-7041
Queen Creek Bridge & Waterfall Canyon Bridge
H856601C
Arizona DOT
Superior, Pinal County County, AZ
10/12/2023 at 04:00
Archer Western is looking for quotes from DBE Certified firms all items including, but not limited to: Construction Area Signs, Traffic Control System, Traffic Control System, PCMS Boards, Temporary Railing (Type K), BMP's, SWPPP, Temporary Erosion Control, Street Sweeping, Temporary Creek Diversion Systems, Striping Removals, Treated Wood Waste, Invasive Species Control, Noise Monitoring, Vibration Monitoring, Remove Concrete, Temporary Fencing, Clear and Grub, Dust Palliative, Roadway Excavation, Structure Excavation, Structure Backfill, Pervious Backfill, Lean Concrete Backfill, Ground Monitoring, Ditch Excavation, Landscape and Irrigation Systems, Permanent Erosion Control, Finishing Roadway, Class 2 Aggregate Subbase, Class 2 Aggregate Base, Lean Concrete Base, Base Bond Breaker, Bond Breaker, Supply HMA and RHMA, Place HMA Dike, Tack Coat, Remove AC Dike, Cold Plane Asphalt Concrete Pavement, Jointed Plain Concrete Pavement, Jointed Plain Concrete Pavement (Rsc), Joint Seal, Remove Concrete Pavement, Grind Existing Concrete Pavement, Ground Anchor, Furnish and Drive Steel Piles, CIDH Piling, Structural Concrete, Minor Concrete, Architectural Treatment, Fractured Rib Texture, Drill And Bond Dowel, Prestressing, Bar Reinforcing Steel, Asphalt, Sign Structure, Sound Wall, Bridge Deck, Furnish and Place Polyester Concrete Overlay, Bridge Removal, Column Casing, Storm Drain, Sand Backfill, Slope Paving, Concrete (Ditch Lining), Rock Slope Protection, Pre/Post Construction Surveys, Miscellaneous Iron And Steel, Miscellaneous Metal (Bridge), Electrical Systems, Fencing, Permanent Striping, Roadside Signs, Guardrail Systems, Concrete Barrier, Trucking, Material Testing
They can also be requested by emailing your request to ArchWestAZ@walshgroup.com or calling (951) 336-7040. Archer Western is requesting pricing for all items of work on the project. Subcontractors and suppliers are required to submit price quotes to us within a reasonable time prior to the bid date, in order to fully evaluate quote. 100% performance bonds may be required for the full subcontracted amount. Subcontractors must possess a valid Arizona Contractor’s license, AZUTRACs, and current insurance. Subcontractor’s will be required to sign a standard subcontract agreement. Please call if you will need assistance in obtaining bonding, lines of credit, insurance, equipment, materials, or delivery schedules. Please contact our office if you are interested in this project. Archer Western will work cooperatively with all qualified firms seeking to work on this project. All quotes must include state license number, and certification number, if applicable.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.