Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Arlene McBayne



Project Estimator

David Annucci



Contact Information

1000 Main Street
New Rochelle, NY 10801



Telephone

(914) 739-1908



Fax

(914) 739-5787



Tutor Perini Corporation
is seeking qualified DBEs, MBEs, WBEs, SBEss


Project Name

East River Tunnel Rehabilitation Project



Bid/Contract #

Contract No. X036-23205



Awarding Agency

Amtrak



Project Location

New York , NY County, NY



Bid Date

11/17/2023 at 02:00



Project Details

The Amtrak East River Tunnel (ERT) Rehabilitation Project will complete the reconstruction of bench wall replacement, systems (communication and signal) engineering, traction power, OCS, mechanical fire/life/safety, and direct fixation rail systems for the Amtrak East River Tunnel Lines 1 and 2, including Demolition of existing track structure and the construction of ballast-less (direct fixation) track to replace the existing ballasted track system. Demolition and reconstruction of the duct banks within the interior structural envelope as well as repairs to leaks and spalls of the concrete tunnel liner (which will remain) of the tunnels. Reconstruction and modernization of all-electric traction, communications, signals, lighting, drainage, fire and life safety, and all other systems within the tunnels. Extension of traction power from Line 1 and 2 portals eastward to Substation #44 in Sunnyside Yard and westward to Substation #43 in Penn Station. Early construction package relocate the S3 cable section that is in Line 2 now back to Line 1 prior to the Line 2 closure Construction of new signal huts at Amtrak 1st Avenue vent plants and at SSYD near Line 1 (F2 IFH) and Line 2 (F1 IFH) portals 2.0 Project.

ALL QUOTATIONS ARE DUE BY COB Friday, November 10, 2023.



An EEO Employer M/F/D/V




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.