Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Denia Lanza-Campos



Project Estimator

Cody Crow



Contact Information

1995 Agua Mansa Road
Riverside, CA 92509



Telephone

(951) 335-0067



Fax

(000) 000-0000



Skanska USA Civil
is seeking qualified SBEss


Project Name

TURNBULL CANYON GRADE SEPARATION PROJECT



Bid/Contract #

Contract No. 16-04



Awarding Agency

San Gabriel Valley Council of Governments (SGVCOG)



Project Location

City of Industry, Los Angeles County, CA



Bid Date

10/11/2023 at 12:00



Project Details

Skanska USA Civil West California District Inc. is interested in soliciting in Good Faith all subcontractors and suppliers as well as certified SBE subcontractors and suppliers. Scopes include, but are not limited to the following and should be based on the Contract and its amendments: Surveying, Traffic Control, Railroad Flagger, SWPPP, Environmental, Demolition and Removal, Temporary Chain Link Fence, Chain Link Fence, Signage, Clear & Grub, Excavation, Retaining Walls, Aggregate Base, Asphalt Paving, Reinforced Concrete Paving, Concrete Paving, Structural Concrete, CIDH Concrete Piling, Joint Seal, Grinding, Sawcutting, Concrete Channel lining, Concrete Slope Paving, Reinforced Concrete Box Culverts, Precast Box Culverts, Outlet Structures, Rebar, Misc Iron and Steel Supply, Prefabricated Steel Truss Bridge, Decorative Reinforced Concrete Block Wall, PVC Pipe, RCP Pipe, Manholes, Catch Basin, Drain Outlet Structures, Curb & Gutter, Concrete Sidewalk, Stamped Concrete, Sewer/Water Utilities, Utility Relocations, Overhead signs, Concrete Barrier, Electrical, QC Testing, Street Sweeping, Water Truck Rental, Onsite & Offsite Trucking, Precast Girders, Bearing Pad Supply, Precast Drainage Media Filters.

General Work Description: The Project will construct a roadway overpass, elevating Turnbull Canyon Road over the railroad tracks and the intersections at Clark Avenue and Salt Lake Avenue (West), extending from Salt Lake Avenue (East) on the north to Marwood Street on the south. Turnbull Canyon Road consists of two lanes in each direction. The Project will elevate the inner lane in each direction over the tracks, while both outer lanes will no longer cross the tracks and remain at-grade to provide local access.



SBE Goal 12%

Plans & Specs can be accessed and download online at:
Owner’s Website: https://pbsystem.planetbids.com/portal/15588/bo/bo-detail/109424
Skanska’s Plan room http://bit.ly/Skanskaplanroom
Submit Bids to: bids.socal@skanska.com

Requirements: Skanska is an Equal Opportunity Employer and is requesting quotes from all qualified subcontractors and suppliers. Skanska will assist qualified subcontractors and suppliers in obtaining bonding, lines of credit, insurance, necessary equipment, materials and/or supplies. To assist SBE subcontractors and suppliers, we will divide total requirements into smaller packages, tasks or quantities and establish delivery and construction schedules which will permit maximum participation when feasible. If you are a SBE Company, please provide your certification letter with your proposal. If you are a non-SBE, please indicate all lower-tier participation in your quotation as it will be evaluated with your price. Subcontracting Requirements: Skanska’s insurance requirements are Commercial General Liability (GL): $1M ea. occ., $1M personal injury, $2M products and completed operations agg. and general agg.; $1M Auto Liability; $5M Excess/Umbrella and $1M Workers Comp. Endorsements and waivers required are the Additional Insured End., Primary Wording End., and a Waiver of Subrogation (GL & WC). Other insurance requirements may be necessary per the scope or RFP requirement. Subcontractors may be required to furnish performance and payment bonds in the full amount of their subcontract by an admitted surety and subject to approval by Skanska. Quotations must be valid for the same duration as specified by the Owner for contract award. Conditions or exceptions in Subcontractor’s quote are expressly rejected unless accepted in writing. Skanska is signatory to the Operating Engineers, Laborers, Cement Masons, and Carpenters Unions. Subcontractors must provide weekly, one original and one copy of all certified payrolls, including non-performance and fringe benefit statements if required by law or by the Prime Contract. All Contractors and Subcontractors must be registered with the DIR (Department of Industrial Relations). Include CSLB License Number and DIR Number on All Quotes Submitted.
Skanska USA Civil West California District is an Equal Opportunity/Affirmative Action Employer EEO/AA/Vet/Disability Employer

Estimating Department: 1995 Agua Mansa Rd, Riverside, CA 92509
Phone: (951) 684-5360 | Lead Estimator: Cody Crow |Email: bids.socal@skanska.com




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.