Heather Baker
1050 Linda Way
Sparks, NV 89431
(775) 356-8004
(000) 000-0000
Recoat Mokelumne Aqueduct No.1 Gully Crossings - Phase 3
Specification 2156
East Bay Municipal Utility District
Oakland, Multiple - See Description County, CA
12/13/2023 at 01:30
We are seeking quotes for: demolition, hazardous material handling, grading, excavation, fill, and hydroseeding.
Work includes abrasive blasting and recoating 18,867LF of 65 inch diameter mokelumne aqueduct #1, 22 linear feet of 68 inch mokelumne aqueduct #2, 203 linear feet of 65 inch mokelumne aqueduct surge line, and 74 linear feet of 62 inch wasteway pipe, including appurtenances at 57 sites in Calaveras, San Joaquin, and Contra Costa Counties. Approximately 3.6 miles (325,700 sqft) will be abrasive blasted and recoated.
The project documents can be downloaded at the district website. https://construction-bids.ebmud.com/CurrentorFutureBid.aspx?BidMode=Current Or, contact us and we will provide.
Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.