Dana Wilkins
Dana Wilkins
132 South Maple Ave
South San Francisco, CA 94080
(650) 267-5300
(650) 267-5302
Recoat Mokelumne Aqueduct No. 1 Phase 13 - Gully Crossings
2156
EBMUD
57 sites in Calaveras, San Joaquin, and Contra Costa Counties, Calaveras, San Joaquin, and Contra Costa County, CA
01/10/2024 at 02:00
Work includes abrasive blasting and recoating 18,869 LF of 65-inch diameter Mokelumne Aqueduct No.1, 22 LF of 68-inch Mokelumne Aqueduct No. 2, 203 LF of 65-inch Mokelumne Aqueduct Surge Line, and 74 LF of 62-inch Wasteway Pipe, including appurtenances, at 57 sites in Calaveras, San Joaquin, and Contra Costa Counties. Approximately 3.6 miles (325,700 square feet) will be abrasive blasted and recoated
We are seeking quotes for the following scopes of work: Trucking, Traffic Control, Site Security, Coating, Hazardous Materials Abatement, General Engineering Contractors
Plans & Specs are available for review in our office or can be viewed online at EBMUD's website: https://construction-bids.ebmud.com/SpecMain.aspx?SpecGN=7256&BidMode=Current. Performance & Payment Bonds may be required. Please contact our office for assistance with bonding, insurance and lines of credit. JMB can also assist with breaking out scopes of work for interested firms. JMB Construction INC 132 South Maple Avenue, South San Francisco, CA 94080. Phone: (650) 267 5300 Fax: (650) 267 5302 An Equal Opportunity Employer
Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.