Metro 78 Annex Phase 1 Clarifier & Gallery Asset Renewal
20054857
Onondaga County Department of Water Environmental Protection
Syracuse , Onondaga County, NY
01/08/2024 at 14:00
This project has a 18% MBE utilization goal and a 12% WBE utilization goal. Jett encourages Minority business enterprise (MBE) and Woman business enterprise (WBE) firms to quote our projects, as well as subcontractors and materials supplier who contract with our firm and utilize MBE and WBE subcontractors and vendors for work to be performed.
The work to be performed includes, but is not limited to the following:
Improvements and rehabilitation of the primary and secondary clarifiers,
Primary and secondary clarifier equipment replacement including center column, drive motor, gearbox, scrappers, draft tubes (for secondary) effluent launders, weirs, and scum collection enhancements,
scum pumping improvements,
walkway, handrail, primary clarifier odor control cover replacement
and primary clarifier dewatering pump replacements.
Also included in the project are the structural rehabilitation, walkway and handrail replacements, conduit and mechanical piping replacements, HVAC replacements, lighting improvements, and drainage improvements to the below grade tunnel galleries (main gallery, digester gallery and primary gallery A and B).
Labor Type: Union, Prevailing Wage, Davis-Bacon, PLA
Steel Requirements: American Iron & Steel (AIS), BABA
Public
This project is available for public bidding via the Kiewit Public Plan Room
Drawings & Specifications
Contract documents, including plans & specifications can be viewed and downloaded
https://app.buildingconnected.com/public/545c695dc26ca11600879dd8
The Bidder will be required to quote in compliance with all project plans and specifications. Non-Disclosure Agreements are provided when applicable. Addenda is posted and notification is sent to all invited bidders.
Insurance Requirements
Upon award, Subcontractors must provide insurance in accordance with our subcontract agreement. A copy of the subcontractor agreement can be found in Building Connected Project Plan Room.
Bonding Requirements
For subcontracts the Bidder shall furnish Performance and Payment Bonds equal to the full subcontract price. For Material Contracts, the bidder shall furnish Supply Bonds in amount equal to full Material Contract price. Bond premiums are reimbursable by Kiewit/Mass. Electric Construction Co. /Jett Industries
Please provide current bond rate with Quote/Proposal or advise if you are unable to bond so that we my address this issue.
Submission of Proposals & Quotes
Proposals & Quotes from Contractors & Suppliers must be submitted on or prior to bid due date listed above. You can submit your quote three ways.
1) Upload your proposal to Building Connected
2) E-mail your quote/ proposal to Project Estimator Listed or procurementwcl@kiewit.com
How to get in touch
Outreach Coordinator
Patricia Salmon
323-574-2432
Jett Industries
Project Estimator
Dan Shults
Dan.shults@kiewit.com
607-433-2100 mobile 607-343-5971
Fax 607-433-2430
Route 7 PO Box 219
Colliersville, NY 13747
Copyright © 2025, DBE GoodFaith, Inc. All rights reserved.