Welcome to DBE Journal, formerly Outreach Impact.
NEWS & EVENTS       GET CERTIFIED       FIND SUBCONTRACTS
Find Subcontract Opportunities


Outreach Coordinator

Joe Goehring



Project Estimator

Joe Goehring



Contact Information

45 Morrison Avenue
Sacramento, CA 95838



Telephone

(916) 283-9950



Fax

(916) 614-9520



Myers & Sons Construction, LLC
is seeking qualified DBEss


Project Name

RT 15 Wildomar RSC Rehab



Bid/Contract #

08-1J5404



Awarding Agency

Caltrans



Project Location

Ontario, San Bernardino County, CA



Bid Date

04/18/2024 at 14:00



Project Details

Myers & Sons Construction, LLC is seeking DBE Subcontractors & Suppliers to bid on an upcoming project with Caltrans, RT 15 Wildomar RSC Rehab, Contract #08-1J5404, Bidding on 3/28/2024 at 2:00 pm PST, 22% DBE goal. The proposed project is in San Bernardino County in Ontario. The California Department of Transportation (Caltrans) is proposing General work description: CB, JPCP (RSC), structural concrete and modifying lighting systems. CONSTRUCTION ON STATE HIGHWAY IN SAN BERNARDINO COUNTY IN ONTARIO AT ROUTE 10/15 SEPARATION. All items are available to bid on including, but not limited to items normally Myers & Sons would self-perform: TRAFFIC CONTROL, TRAFFIC CONTROL DEVICES, SIGNAGE, SAW CUTTINGTEMPORARY BARRIER SYSTEM, EROSION CONTROL, LANDSCAPE & IRRIGATION, ELECTRICAL, METAL BEAM GUARDRAIL, TRUCKING, STREET SWEEPING, ALL MATERIALS, SWPP REPORTS, JOINT SEALS, CLEARING & GRUBBING, IMPORTED BURROW, AC SCOPE, MINOR CONCRETE, PIPING, ROCK SLOPE PROTECTION, REBAR, STRIPING, CONCRETE BARRIER, BARRIER DEMOLITION AND ALL OTHER ITEMS LISTED ON THE BID LIST.



Requirements: 100% performance and payment bonds may be required for the full amount of the subcontract price. Subcontractors must possess a valid contractor's license, DIR registration number, and current insurance meeting Myers & Sons Construction's requirements. Subcontractors will be required to sign the standard Myers & Sons Construction, LLC Subcontract Agreement. Quotations must be valid for one hundred and twenty (120) days after the specified Contract Award Date by the Owner. Plans and Specifications are available for viewing at our Sacramento office, please contact (916) 283-9950 or estimating@myers-sons.com. Plans and Specs can also be downloaded through https://ppmoe.dot.ca.gov/des/oe/weekly-ads/oe-project.php?q=08-1J5404&sub=.

Please call if you need assistance in obtaining bonding, insurance, equipment, materials and/or supplies or visit our website at www.myers-sons.com for more information. Myers & Sons Construction, LLC will work cooperatively with all qualified firms seeking work on this project. Myers & Sons Construction is signatory to the Laborers, Carpenters, Cement Masons and Operating Engineers. Myers & Sons Construction, LLC is an equal opportunity employer.

** All items are open for bid, including items of work normally performed by Myers & Sons Construction. Quotations will be broken down into comparable packages as reasonably necessary. Myers & Sons Construction will work with interested DBE subcontractors to identify opportunities to break down items into economically feasible packages. **




Copyright © 2024, DBE GoodFaith, Inc. All rights reserved.